Copyright © 2014 Huawei Technologies Co., Ltd.. Copyright © 2014 Huawei Technologies Co., Ltd.. Definitions of IP Address of the OMU The OMU IP addresses include:  External fixed IP ad

Trang 1

www.huawei.comBSC6900&BSC6910 GU V900R016 Install

ation and Commissioning

Trang 2

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page3

Foreword

 The OMU operating system is installed before the OMU is delivered.

 BSC6900&BSC6910 commissioning is performed after the hardware is installed and before the service

s are provided It aims to ensure that BSC6900&BSC6910 can work normally through tasks such as eq uipment verification, BSC6900&BSC6910 board software and data file loading, interface verification, a

nd service verification.

Trang 3

 BSC6900 GU Commissioning Guide

 BSC6910 GU Commissioning Guide

 BSC6900 OMU Administration Guide

 BSC6910 OMU Administration Guide

Trang 4

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page5

Objectives

 Upon completion of this course, you will be able to:

 Describe BSC6900&BSC6910 commissioning procedure

 Outline OMU structure and OMU software functions

 Complete BSC6900&BSC6910 commissioning

Trang 5

1. BSC6900&BSC6910 O&M System Introduction

2 BSC6900&BSC6910 Software Installation

3 BSC6900&BSC6910 Commissioning

Trang 6

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page7

BSC6900&BSC6910 O&M Subsystem

Trang 7

BSC6900&BSC6910 O&M Subsystem ( Cont )

 BSC6900&BSC6910 O&M system adopts server and client mode

 LMT as a client

 EMS (Element Management System) system

 iManager U2000 works for integrated O&M

Trang 8

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page9

OMU Ethernet Adapter Configuration

 An OMUa or EOMUa board is configured with six Ethernet adapters in total

 ETH0 and ETH1:(bond1/bond1:0 )

 ETH2: (bond2)

 ETH3-UPDATE: (bond3)

 ETH4-SCU7 and ETH5-SCU6: (bond0 (vlan1/vlan1:0))

Trang 9

Definitions of IP Address of the OMU

 The OMU IP addresses include:

 External fixed IP addresses

 Internal fixed IP addresses

 External virtual IP addresses

 Internal virtual IP addresses

 Backup channel IP address between active and standby OMU boards

Trang 10

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page11

IP Address Planning Principle

Internal fixed IP address

The preset IP addresses of the internal Ethernet adapters are:

Active OMU: 80.168.3.50 (255.0.0.0)

Standby OMU: 80.168.3.60 (255.0.0.0)

External fixed IP address

The preset IP addresses of the external Ethernet adapters are:

Active OMU: 172.121.139.201 (255.255.255.0)

Standby OMU: 172.121.139.202 (255.255.255.0)The settings can be reconfigured on site based on the actual networking topologyOMU IP Address Planning

Trang 11

OMU Internal Network IP Address Planning

Active EOMUa

Internal network segment

Intel Ethernet adapters

Dedicated backup channel

Virtual IP 80.168.3.40/8

Virtual IP 80.168.3.40/8

Trang 12

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page13

OMU IP Address Planning

IP Address Planning Principle

Debugging IP address

The default debugging IP addresses are:

Active OMU: 192.168.6.50 (255.255.255.0)

Standby OMU: 192.168.6.60 (255.255.255.0)The IP addresses can be changed based on the network plan.

Trang 13

OMU External Network IP Address Planning

Active EOMUa

LMT/ U2000

Standby EOMUa

External network Segment

GE adapter

172.121.139.201/24 172.121.139.202/24

Virtual IP 172.121.139.200/24

ETH0 ETH1

ETH2

ETH0 ETH1

ETH2

192.168.6.60/24 192.168.6.50/24

Switch

Commissioning Ethernet adapter

Trang 14

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page15

Contents

Trang 15

BSC6900&BSC6910 Software

Dopra Linux Mysql Database

OMU Application OMU Server

MPS/EPS

Host Software

Program File

Patch File (optional) Data File

LMT

Windows XP/

Windows 7

Java Environment LMT Software

Trang 16

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved

 OMU consists of :

 OMU operating system

 OMU software consist of :

 OMU service monitoring

entities

 OMU service processes

Page17

OMU Software

Trang 17

OMU Software Installation Procedure

Trang 18

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page20

Obtain the Installation Information of the OMU

 Before the installation, obtain the following information from Data Sheet of OMU Software

Installation.

 Password of the operating system administrator

 Fixed IP address of the external network, virtual IP address of the external network, or

debugging IP address of the OMU

Trang 19

Logging in to the OMU

 On the computer run the SSH terminal,

PuTTY.

 Enter the IP address of the OMU.

Log in to the OMU as user root.

Trang 20

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page22

Uploading the OMU Application Installation Packet to the OMU

 Decompress the MBSC version software package to the local drive D.

Log in to the OMU through the psftp software

Run the lcd D:\ command to set the local directory.

Run the mkdir /mbsc/upgrade command to create the target directory.

Trang 21

Run the cd /mbsc/upgrade command to go to the target directory.

Run the put -r V100R016C00 command to upload the OMU application installation packet to

the OMU

After the loading is complete, enter the exit command to exist the psftp software.

Uploading the OMU Application Installation Packet to the

OMU (Cont.)

Trang 22

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page24

Installing the OMU Application in the Active Area

 Assume that the OMU application installation package install_bam.sh is saved in

/mbsc/upgrade/V100R016C00/install/setup (BSC6910)

/mbsc/upgrade/V900R016C00/install/setup (BSC6900)

Trang 23

Installing the OMU Application in the Active Area ( Cont )

 On the PuTTY terminal, run the following commands:

cd /mbsc/upgrade/V100R016C00/install/setup

chmod +x /install_bam.sh

./install_bam.sh

Enter the run mode

Setting the office name

Setting the language

Setting the external virtual IP address

Trang 24

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page26

 Setting the run mode of product

 Setting the office name

 Setting the language

Trang 25

Installing the OMU Application in the Active Area ( Cont )

 Setting the admin/FTP password

 Setting the external virtual IP address

Trang 26

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page28

 Setting the OMU system type

 Confirming the installation

Enter Y to install the OMU applications

When the message "Install OMU succeed!" is displayed, you can infer that the OMU

applications are successfully installed

Trang 27

Checking the Installation Directory of the OMU Applications

 The version_a and version_b folders save

active/standby OMU workspace files

 Check whether the OMU installation

directory

active workspace active and standby

workspaces

Trang 28

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page30

Checking the Status of omud Process

Log in to the OMU by PuTTY.

Run the /etc/rc.d/omud status command.

The returned information is running, it means the omud is working normally.

The returned information is unused, run the /etc/rc.d/omud start command to start the

omud

The returned information is neither running nor unused, reinstall the OMU application in the

active workspace

Trang 29

Installing OMU Applications by Using a USB Storage Device

 A USB storage device is used in the following three scenarios:

 Initially installing the OMU operating system and applications.

 Restoring the corrupted OMU operating system.

 Procedure:

 Prepare a USB storage device which have already install the data.

 Insert the USB storage device into any of the USB ports on the OMU board panel.

 Remove and then install the OMU board to reset the OMU.

Trang 30

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page32

 Wait 1 to 2 minutes and then use the USB storage device to install the OMU operating system Check the status of indicators on the OMU board panel to determine whether the OMU operating system is installed successfully

 If only the operating system is to be installed on the OMU, check the indicator status as follow:

EOMUa

The RUN indicator blinks.

The ALM indicator is off or blinks.

The ACT indicator is off.

The OFFLINE indicator is off.

The RUN indicator is off.

The ALM indicator blinks.

The ACT indicator is off.

The OFFLINE indicator blinks.

t.)

Trang 31

 If the operating system and applications are to be installed on the OMU, check the indicator status as follow:

 After the OMU operating system and the OMU applications are installed successfully, remove the USB storage device from the OMU board panel in a timely manner

EOMUa

The RUN indicator blinks.

The ALM indicator is steady on or off.

The ACT indicator is steady on or off.

The OFFLINE indicator is off.

The RUN indicator blinks.

The ALM indicator blinks.

The ACT indicator is off.

The OFFLINE indicator is off.

t.)

Trang 32

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page34

Contents

Trang 33

3 BSC6900&BSC6910 Commissioning

3.1 BSC6900&BSC6910 Commissioning Introduction

3.2 BSC6900&BSC6910 Commissioning Procedure

Trang 34

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved

 Definition of BSC6910 Commissioning

 BSC6910 commissioning is performed after the hardware is installed and before the services are provided

 It aims to ensure that the BSC6910 can work properly by performing verification tasks related to equipmen

t, BSC6910 board software and data file loading, interfaces, and services

Introduction to BSC6900&BSC6910 Commissioning

Page36

Trang 35

Preparation for BSC6900&BSC6910 Commissioning

 Preparation For BSC6910 Commissioning

 Verify hardware status

 BSC6910 hardware is installed and passed the hardware installation check and

powering-on check

 OMU is configured before delivery

 LMT PC meets the configuration requirements

 OMU and LMT application software are ready

 License file is ready

 MML command script for initial configuration is ready

Trang 36

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page38

 Verify commissioning network status

 At least one BTS and one NodeB are connected to the local BSC6910 The BTS and the NodeB should have passed commissioning and can provide basic functions

 At least one set of Core Network (CN) equipment is connected to the local BSC6910 The

CN equipment should have passed the commissioning and can provide basic functions

 If the BSC6910 is connected to the MBSC, then that MBSC must have passed the

commissioning

 Three single-mode UEs, three single-mode MSs and one dual-mode UE are ready for test and are registered in the HLR

Trang 37

3 BSC6900&BSC6910 Commissioning

3.1 BSC6900&BSC6910 Commissioning Introduction

3.2 BSC6900&BSC6910 Commissioning Procedure

Trang 38

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page40

BSC6900&BSC6910 Commissioning Procedure

Continued in the next page

Trang 39

BSC6900&BSC6910 Commissioning Procedure ( Cont )

Verify interfaces through LMT Set NE to be in

maintenance mode Verify GSM Interface

Verify UMTS Interface

End the maintenance mode of NE Verify Interface

Handle alarms

Verify GSM services

Verify UMTS services

Remote operation based on local cooperation

Trang 40

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page42

Checking the Operating Status of the Hardware

 Before verifying the equipment, ensure that the cabinet is powered on and operates

normally

 Checklist of the power supply to the cabinet components

Component Normal Power Supply Status

Board The RUN indicator on the board panel blinks one second on and one second off in

green.

Fan box The RUN indicator on the fan box panel blinks one second on and one second off

in green after the subrack is powered on.

PEM The STATUS indicator on the panel is green and steady on.

Trang 41

Verifying the OMU

Activating and Verifying the License

Loading BSC6900&BSC6910 Board Software

and Data Files Verifying the Interfaces

Handling the Alarms

Verifying the Services

Connecting BSC6900&BSC6910 to the U2000

Verifying network reliability

1 Logging in to the OMU

2 Check the running status of the OMU process

3 Query the current version of the OMU application.

4 Change the external fixed/ virtual IP address

6 Change the name and set the working mode of the OMU

7.Change the run mode and office name of OMU

8 Check the operating status of the OMU

Main Steps of Commissioning

Updating the OMU Database

Trang 42

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page44

Logging In to the OMU

 On the computer run the SSH terminal,

PuTTY.

 Enter the IP address of the OMU.

Log in to the OMU as user root.

Trang 43

Check the Operating Status of OMU Processes

Run the /etc/rc.d/omud status command to check the running status of OMU processes

Trang 44

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page46

Querying the Current Version of the OMU Application

Run the cd /mbsc/upgrade command to switch to the OMU installation directory, and

then run the ls command to query the current version of the OMU application

 If the version of the OMU application is different from that required by the operator,

Uninstalling the OMU application firstly , and then install the OMU application in the active workspace

Trang 45

Querying the Network Configuration of the OMU Ethernet Adapt ers

 Querying the external fixed IP address: ifconfig bond1

 Querying the external virtual IP address: ifconfig bond1:0

 Querying the internal fixed IP address: ifconfig vlan1

 Querying the internal virtual IP address: ifconfig vlan1:0

 Querying the debugging IP address: ifconfig bond2

 Querying the IP address for the backup channel between the active EOMUa and the standby EOMUa: ifconfig bond3

Trang 46

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page48

Changing the External IP Address

Run the cd /mbsc/bam/version_a/bin/bam command to switch to the directory where the

omutool program locates

Run the /omutool command to start omutool.

Run the /omutool extercard The external fixed IP address The subnet mask (The gateway IP

address) command to change the external fixed IP address and the subnet mask

 /omutool extercard 10.161.10.100 255.255.255.0 10.161.10.1

Run the /omutool extervip The external virtual IP address The subnet mask command to

change the external virtual IP address and the subnet mask

 /omutool extervip 10.161.10.102 255.255.255.0

Trang 47

Changing the Name

Run the /omutool hostname OMU name command to change the name of the OMU

For example, you can run the following command and then press Enter to change the OMU name to omu_123: /omutool hostname omu_123.

Trang 48

Copyright © 2014 Huawei Technologies Co., Ltd All rights reserved Page50

Setting the Work Mode of the OMU

 Set the work mode of the OMU according to the number of OMU boards that are

configured

If only one OMU board is configured, run the /omutool dualmode single command to set the

work mode to the single-server mode

If two OMU boards (active and standby OMU boards) are configured, run the /omutool

dualmode dual command to set the work mode to the dual-server mode.