Six Sigma Project Adapted from: “The Toyota” Way Fieldbook, Liker and Meier Lean Event Daily Kaizen... Make your work easier 2.. Make your work more interesting 3.. Before After Taki
Trang 5•
Trang 6Six Sigma Project
Adapted from: “The Toyota” Way Fieldbook, Liker and Meier
Lean Event
Daily Kaizen
Trang 7cornerstone
Trang 9•
–
–
Trang 13AJN Report: The Other Side of Mandatory Overtime Roxanne Nelson BSN, RN
Maureen Shawn Kennedy MA, RN, editorial director AJN, American Journal of Nursing
April 2008, Volume 108 Number 4, Pages 23 - 24
Trang 14–
Trang 201. Make your work easier
2. Make your work more
interesting
3. Develop your skills &
capabilities
Norman Bodek
Trang 22Ideas
Improvements
Trang 31Before After
Taking time digging through the bucket on top
of the crash cart to try to find the correct size
blood pressure cuffs This can be problematic
during an EHART® when you want to get a
blood pressure (BP) in a hurry so that you can
get medications in the patients
Place a small strip of Velcro® brand hook and loop fasteners on the wall with different sizes of BP cuffs Staff is able to quickly visualize the different sized cuff and get the proper size for the patient, and the blood pressure can be obtained quicker
The Effect
Improved quality of care and faster response to the needs of the patient in an acute setting
Trang 38•
•
•
•
Trang 40Before Lean 12 Months
After Starting Lean
3 I have the opportunity to do what I do
best every day 3.11 3.92
8 I feel free to make suggestions for
10 I feel secure in my job 2.32 3.42
13 Stress at work is manageable 2.43 3.23
17 I am satisfied with the lab as a place
18 I would recommend my work area as
a good place to work to others 2.38 3.46
Grand Average 2.96 3.69
Trang 45“