Tiêu đề Ste. Genevieve Plant Tour World’s Largest Single Kiln Line Cement Plant
Người hướng dẫn Jeff Ouhl – Vice President / Plant Manager
Trường học Holcim Ltd
Chuyên ngành Construction / Cement Industry
Thể loại Presentation
Năm xuất bản 2010
Thành phố Ste. Genevieve
Định dạng
Số trang 46
Dung lượng 1,9 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010 Summary – site specific safety training Safety first • Holcim believes that the safety and health of all personnel workin

Trang 1

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Ste Genevieve Plant Tour

World’s largest single kiln line cement plant

Jeff Ouhl – Vice President / Plant Manager

September 14, 2010

Trang 2

1 Site specific safety training – 10 minutes

2 Quick summary “the making of cement” – 5 minutes

3 Ste Genevieve plant preview – 40 minutes

4 Plant tour – approximately 60 minutes

5 Questions & answers

6 Depart for hotel at 17:15

Trang 3

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Summary – site specific safety training

Safety first

• Holcim believes that the safety and health of all

personnel working at our plant is our number one

priority

• We also believe that zero accidents is achievable and the only acceptable goal

• You are responsible for staying with your escort and

following the directions of your escort at all times

• If you are unsure about a situation, please stop and get clarification 90% of all workplace accidents are the

result of a poor or uninformed decision

Trang 4

1 Site specific safety training – 10 minutes

2 Quick summary “the making of cement” – 5 minutes

3 Ste Genevieve plant preview – 40 minutes

4 Plant tour – approximately 60 minutes

5 Questions & answers

6 Depart for hotel at 17:15

Trang 5

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Quick summary – cement and concrete

Trang 6

Cement plant Process Flow

Kiln System

“Burning”

ACE ACE

Grinding Distribution Raw Mills

Trang 7

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Agenda

1 Site specific safety training – 10 minutes

2 Quick summary “the making of cement” – 5 minutes

3 Ste Genevieve plant preview – 40 minutes

4 Plant tour – approximately 60 minutes

5 Questions & answers

6 Depart for hotel at 17:15

Trang 8

Ste Genevieve plant project goals – simple and clear

No fatalities; no serious accidents

No tolerance for unsafe conditions, behaviors, design

Meet scheduled start-up dates

Meet capital investment commitment

Meet operational commitments = volume & costs

Trang 9

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Zero accidents is achievable!

• Qualified contractors – must meet minimum requirements to bid

work

• ALL construction workers must have

 10/30 hours safety training

 4 hours site specific training

• Zero tolerance for certain unsafe acts/conditions

• Financial penalties and rewards to contractors

• Tight access control

Trang 10

• > 40 Environmental studies completed

• 8 state and federal regulatory agencies with jurisdiction

• Final permits received – June 2004

• Administrative and legal appeals to issued permits

 Defended 3 appeals cases up to September, 2004

 Settlement of permit appeals – October 2004

 MDNR §401 Water Quality Certificate

Trang 11

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

3,900 acre site, 2,200 acre conservation easement area, 61 acres of new wetlands created

Trang 12

Environmental control – best available control technology (BACT) used

• NOx reduction – multi stage combustion & SNCR

• SO2 reduction – lime injection system when raw mills down

• PM10 reduction

 Latest technology fabric filters

 Covered storage for material storage areas

 Covered belts for material transport

 Road paving throughout plant

 Haul road watering, paved road washing, truck washing

• Opacity monitors on stacks

• Continuous emission monitoring of combustion exhaust points

• One of the most energy efficient cement plants in the US

• Selective quarrying in combination with mining plan

Trang 13

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Cement manufacturing process

The key operational areas of a cement plant are:

• Raw material extraction

• Kiln feed preparation

• Kiln operations – “burning” clinker

• Cement grinding

• Cement shipping

• Quality control

Trang 14

Limestone is the main component

plant raw mix is limestone

calcium, a lesser percentage

of silica, and possibly small amounts of alumina and iron

mix

Trang 15

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Typical quarry operation

limestone

waste

Trang 16

Raw mills (2) for kiln feed preparation

Trang 17

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Preheater Precalciner Kiln

Trang 18

Ste Genevieve preheat tower

except bottom stage is

dual 8.5 meter ø

retention time

Trang 19

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Ste Genevieve three support kiln system

6.6 Meter Dia X 93 Meter L 3.6 RPM Nominal, 5.0 RPM Max

Tangential

suspension Semi-rigid

supports

Trang 20

Kiln station, refractory installation and kiln firing, July 2009

Trang 21

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

New generation MMC 23x123 clinker cooler

• Cools the clinker from the kiln for transport & storage

• Recovers heat from clinker for firing in kiln and

improves thermal efficiency

• 80 deg + ambient clinker

Trang 22

Coal/petcoke grinding (2) ATOX 27.5 mills

• 37 t/h petcoke or,

• 70 t/h coal

• 740 kW each

Trang 23

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Cement grinding – (4 mills)

Trang 24

Huge investment in quality control – consistent supply automated lab

is key to meeting our goal

Trang 25

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Product quality assurance and control – highly automated for quick

response

• Fully automated lab system (Robolab – FLS)

 Sampling, transport to lab, preparation of pressed tablets,

analysis, mix control

• 2 PGNAA Cross Belt Analyzers

• New Omni Generation by Thermo Fisher

 Remote displays in Quarry Mobile Equipment

• XRF and backup XRF (main oxide analysis) (Panalytical)

• XRD with Rietveld capability (fast free-lime; phase analysis)

(Panalytical)

-• Particle Size Analyzer (Sympatec)

• Cross-belt moisture analyzer for incoming raw materials and coal

Trang 26

Ste Genevieve plant story

480 days without a LTA (Holcim and Contractors)

employees – validated by performance!

 Plant staff working extremely diligently to solve startup issues and optimize the plant

 High degree of ownership and therefore performance

 Achieved goal of high availability first (mills and kiln)

 Mill rates running above design, kiln rate now increased

markets

Trang 27

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Our strength is our people – recruiting process was a resounding

success!

team

 Hired all employees First for “Attitude and Aptitude”

 Multi-skilled organizational design

 Mechanical / electrical skills important

 Soft skills, leadership skills, and team-building skills

 Basic technical skills – welding, hydraulics, pneumatics, etc

 Specific technical skills – electrical switchgear, FLS equipment

commissioned and started-up with:

 No major injuries or equipment damage

 Excellent OEE on start up

 High degree of ownership

Trang 28

Startup First Clinker (assumes July 4 th startup)

Startup after Kiln Bearing Issues (assumes August 13 th Startup)

Months of operation

Ste Geneviève Average 13 Kilns

Trang 29

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

GV product is approved for use by DOT’s in the entire river market

Trident

Ada Portland

Approved Jul 7

OHDOT Approved Aug 31

IADOT Approved Jul 24 IDOT

Approved Jul 7 MoDOT Approved Jul 10

LaDOT Approved Sept 22

MIDOT Approved Oct 12 INDOT Approved Oct 12

KYDOT Approved Oct 12 TDOT Approved Sept 21

NDDOT Approved Jul 24

TxDOT Approved Sept 1

ARDOT Approved Aug 27 MSDOTApproved Oct 5

KSDOT Approved Oct 14

GV primary shipping destinations

SDDOT Approved Nov 5

NBDOT Approved Nov 19

GV secondary shipping destinations (no approval applied for yet)

NYDOT Tentative Approval

OKDOT Approved Apr/2010

Trang 30

Meeting or exceeding all quality targets

STE GENEVIEVE Competitor 1 Competitor 2 Competitor 3

Competitor 4 Competitor 5 Competitor 6 Competitor 7

HCA-MISSISSAUGA (Holly Hill)

GV Target 2500 psi

GV Target 6500 psi

Ste Geneviève 1- and 28-days Strength

Trang 31

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Although no real maintenance costs realized to date, operating costs are better than anticipated

Mothballed/Closed

US Plants Full Year

Specific Power Consumption

(excl shipping) [kWh/t cem]

TOTAL Specific Cash Cost

Trang 32

Thermal energy (fuel) efficiency continues to improve – MTBF

improvement is main driver

 3,000  3,050  3,100  3,150  3,200  3,250  3,300  3,350  3,400  3,450  3,500  3,550

Trang 33

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Environmental – stack tests completed and in compliance with all

requirements

0.0 200.0 400.0 600.0 800.0 1000.0 1200.0 1400.0 1600.0

Trang 34

Port capabilities & river access

Key element of success for this plant is river access

& unloading

 Coal, Petcoke, Gypsum, Fly ash

barge line agreements for transportation

Trang 35

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Slack-water harbor on Mississippi River for loading/unloading up to 6Mt/y of materials

North Fleeting Area - 60

barges

South Fleeting Area

-23 barges Inbound Unloading

Cement Loading

Trang 36

Harbor cross section

Harbor accommodates >16 m water level fluctuation

Loading silos

Inbound material unloading station Barge loading station

Rail loading

station

Trang 37

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Harbor water level at normal operating depth with no flooding and all modes of distribution available

September 2007

Trang 38

Harbor depth at above normal level with no affect to any mode of

distribution

April 2008

Trang 39

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Harbor above flood levels with all rail traffic terminated barge loading and unloading is not impacted

June 2008

Trang 41

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Agenda

1 Site specific safety training – 10 minutes

2 Quick summary “the making of cement” – 5 minutes

3 Ste Genevieve plant preview – 40 minutes

4 Plant tour – approximately 60 minutes

5 Questions & answers

6 Depart for hotel at 17:15

Trang 42

1 Site specific safety training – 10 minutes

2 Quick summary “the making of cement” – 5 minutes

3 Ste Genevieve plant preview – 40 minutes

4 Plant tour – approximately 60 minutes

5 Questions & answers

6 Depart for hotel at 17:15

Trang 43

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Agenda

1 Site specific safety training – 10 minutes

2 Quick summary “the making of cement” – 5 minutes

3 Ste Genevieve plant preview – 40 minutes

4 Plant tour – approximately 60 minutes

5 Questions & answers

6 Depart for hotel at 17:15

Trang 45

© Holcim Ltd 2010 Investor / Analyst Capital Markets Event 2010

Disclaimer

Cautionary statement regarding forward-looking statements

This presentation may contain certain forward-looking statements relating to the Group’s future business, development and economic performance

Such statements may be subject to a number of risks, uncertainties and

other important factors, such as but not limited to (1) competitive pressures; (2) legislative and regulatory developments; (3) global, macroeconomic and political trends; (4) fluctuations in currency exchange rates and general

financial market conditions; (5) delay or inability in obtaining approvals from authorities; (6) technical developments; (7) litigation; (8) adverse publicity

and news coverage, which could cause actual development and results to

differ materially from the statements made in this presentation Holcim

assumes no obligation to update or alter forward-looking statements whether

as a result of new information, future events or otherwise.

As part of Holcim's global commitment to compliance with competition laws, please note that this presentation has been comprehensively reviewed by

counsel in both the United States and Switzerland.

Trang 46

Strength Performance Passion.