In the manufacturing process grindingoperation is carried out on following machine :- Correct Answer Cylindrical grinder Your Answer Cylindrical grinder Multiple Choice Single Answer Que
Trang 2LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
After completion of manufacturing, Jay Jee took following actions:-
Correct Answer Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount , Did not send theconsignment by Hansa's designated carrier
Your Answer Did not send the consignment by Hansa's designated carrier ,
Dispatched the consignment by Express Roadlines by truck ,Raised the Hundi for the invoiced amount
Multiple Choice Single Answer
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
During the meeting with G.M (Mr Kaul) Store Keeper Mr Bapatinformed that purchases were made from :-
Correct Answer Several sources
Your Answer Several sources
Multiple Choice Single Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
One of the following is not a variable Correct Answer Space
overhead:-Your Answer Space
True/False
Question This Question refers to 'Uday Electroplating Shop' : As per cost
figures collected, Expected volume of work on special equipmentnext year is 10,000 Nos
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question This Question refers to the case of Narmada Electricals Ltd.: In
the existing method, the scarp generated in processes likemachining was stored in :-
Correct Answer Scrap yard
Your Answer Scrap yard
Match The Following
Question Correct Answer Your Answer
Trang 3Anonymous letter
received by M.D
Need to justify Need to justify
This question refers to the
Reason for failure to
convince the Board of
Directors
No material facts tosupport the arguments No confidence in Materialmanager and Senior
buyersLot of items on the
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The new items contracted by the company are handled
by the development department for Correct Answer Submission of samples , Manufacture of one or two production
:-lots , Transfer to manufacturing department for regularproduction, after successful development
Your Answer Submission of samples , Manufacture of one or two production
lots , Transfer to manufacturing department for regularproduction, after successful development
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established machineshop having more than 150 machines and :-
Correct Answer A heat treatment shop , Metrology section , Packing sectionYour Answer A heat treatment shop , Metrology section , Packing section
Multiple Choice Single Answer
Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company also executes Correct Answer Rush orders
:-Your Answer Rush orders
Select The Blank
Question This Question refers to 'Uday Electroplating Shop' :The owner
finds it to get part time employees when there isheavy work load
Correct Answer Difficult
Your Answer Difficult
Multiple Choice Single Answer
Trang 4Question The question refer to the case on 'Kalpak Engineers' :Kalpak
Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt In the manufacturing process grindingoperation is carried out on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder
Multiple Choice Single Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Process sheet for exhaust manifold provides followinginformation:-
Correct Answer Jigs and fixtures required
Your Answer Jigs and fixtures required
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company supplies components to Correct Answer Automobile industries , Printing machines , Machine tool &
:-process equipment industriesYour Answer Automobile industries , Printing machines , Machine tool &
process equipment industries
True/False
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr Sen noticed that each worker wasprovided with the drawing of the component
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Eagle Machine Company' :
Cost of running Sally's department is Rs 3,70,000 per year This
is on account of Correct Answer Salaries , Fringes , Expenses
:-Your Answer Salaries , Fringes , Expenses
Select The Blank
Question This Question refers to the case 'Quality Gauges Pvt Ltd.' : After
the introduction of scheme, shop floor manager has complained
of pressure from workmen for
Correct Answer Overtime
Your Answer Overtime
Trang 5Match The Following
Question Correct Answer Your Answer
Test of viability of
standards
Production study Production study
This question refers to
Work Measurement Job Evaluation
Select The Blank
Question This Question refers to the case of 'The Irate Vendor' : Jones
had been brought in by a management consultant to the department's buying activities
Correct Answer Centralize
Your Answer Centralize
Multiple Choice Single Answer
Question This Question refers to the case of 'Kerson Automobiles' : It was
decided to modify the existing layout of the plant in the year Correct Answer 1972
:-Your Answer 1972
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company has received a special orderwhere :-
Correct Answer A special cylinder is to be manufactured , The item is to be
manufactured from a hollow bored forging , Fastest delivery isrequested
Your Answer A special cylinder is to be manufactured , The item is to be
manufactured from a hollow bored forging , Fastest delivery isrequested
Select The Blank
Question This question refer to the case on "Allied Industries Pvt Ltd" :
One of the assumptions of the case is- other incidental costs(e.g paper work, Transport charges for acquiring and regrindingthread roll) are
Correct Answer Negligible
Trang 6Your Answer Low
Select The Blank
Question This Question refers to the case of 'Artwood Products' : The
furniture is sold through distributors
Correct Answer Standard
Your Answer Standard
Multiple Choice Single Answer
Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : It is a Correct Answer Light engineering company
:-Your Answer Light engineering company
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
average efficiency on the other components currently beingproduced is around 75%
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This Question refers to the case 'Suyog Udyog' : The process
involves the use of Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drillYour Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
:-Select The Blank
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs
and fixtures once provided will be able to maintain accuracy up
to about pieces
Correct Answer 20000
Your Answer 20000
True/False
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : "It is difficult to install an incentive scheme and easy towithdraw when desired."
Correct Answer False
Your Answer True
Trang 7Question This Question refers to the case 'Suyog Udyog' : The operation
time for C' sunk 14 dia holes on both sides is 0.50 per piece.Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Geer Company' :
Problems got created due to Correct Answer Added work load in purchasing , Divided buying responsibilities ,
:-Number of inexperienced buyersYour Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers
Multiple Choice Single Answer
Question This Question refers to the case 'Indus Foundries Ltd.': The
company is faced with following problems Correct Answer Choice of Location
:-Your Answer Choice of Plant machinery
Multiple Choice Multiple Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Following is the information requirement for using CPM/PERTtechniques:-
Correct Answer List of activities , Activity duration , Precedent relationship of the
activitiesYour Answer List of activities , Activity duration , Person responsible for
activity completion
Multiple Choice Single Answer
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : The success of an incentive plan to a large extentdepends on the following factor:-
Correct Answer Quality of performance standard
Your Answer Production Planning and Control system
Multiple Choice Multiple Answer
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following systems are prerequisites for an incentivescheme:-
Correct Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accountingoperators daily output
Your Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
Trang 8operators daily output
Select The Blank
Question This Question refers to the case of 'K.T Gears' : The problem
envisages determining the rate of before and afterimprovement in the existing method
Correct Answer Production
Your Answer Speed
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Geer Company' : The
problems reported are Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect
:-ordering quantitiesYour Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities
Multiple Choice Single Answer
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following practice if prevalent, must be eliminated toguarantee success of wage incentive scheme :-
Correct Answer Overtime
Your Answer Encashment of leave
True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
The organization has reputation for poor deliveries
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Use of Network Techniques beside computing project durationalso helps in the following :-
Correct Answer Possibilities of reducing project duration
Your Answer Computing manpower requirement
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production Correct Answer Routing
planning:-Your Answer Scheduling
Trang 9Multiple Choice Single Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The machines were completed by Kay Jee Correct Answer Within the stipulated delivery period
:-Your Answer Within the stipulated delivery period
Select The Blank
Question This Question refers to the case of 'Kerson Automobiles' : The
pedestal grinder mounted on the huge work table, gives out and blows out dust
Correct Answer Sparks
Your Answer Sparks
Select The Blank
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In
machining Exhaust Manifold, no cutting oil is required as thematerial is
Correct Answer Cast iron
Your Answer Plastic
Select The Blank
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Success of wage incentive plans to a large extentdepends on the of performance standards
Correct Answer Quality
Your Answer Quality
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
cost of foundry reject is borne by the company
Correct Answer True
Your Answer True
True/False
Question This question refers to the case of 'Northern Machinery Ltd' : As
per summary of purchases of the last year, Material cost as aproportion of sales is 26%
Correct Answer False
Your Answer True
Trang 10Question This Question refers to the case 'Quality Gauges Pvt Ltd.' : The
executives were entitled for incentive bonus
Correct Answer True
Your Answer True
Select The Blank
Question This Question refers to the case 'Suyog Udyog' : Number of work
stations are to be decided based on assumption that monthly offtake is numbers
Correct Answer 8000
Your Answer 8000
Trang 11Cases in Operation Management
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question This Question refers to the case of 'The Irate Vendor' : Tom
Jones has been hired as Purchasing director for a companywhich is a :-
Correct Answer Medium sized food products firm
Your Answer Medium sized food products firm
Multiple Choice Single Answer
Question This Question refers to the case of 'Artwood Products' : The
company is engaged in design and manufacture of woodenfurniture The critical factor in acceptance of furniture is :-Correct Answer Quality
Your Answer Quality
Select The Blank
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Overtime must be to guarantee the success
of the wage incentive scheme
Correct Answer Eliminative
Your Answer Eliminative
True/False
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
Kay Jee dispatched the consignment as per the terms of theorder
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question This Question refers to the case 'Suyog Udyog' : Operation
details are as follows Correct Answer Drill and ream 3 holes, 14 mm dia , Deburr , Mill 2 slots 28 mm
:-wideYour Answer Deburr , Mill 2 slots 28 mm wide
Match The Following
Question Correct Answer Your Answer
Trang 12Machine shop congested
with semi-processed
material kept in the bins
and components lying on
the floors all around
Shortage of space Shortage of space
This Question refers to the
Shared by operators Calibrated in Quality
control department of theCompany
Unispected lots Processed Identifiable by tags and
markingsResponsibility of oiling
/greasing
Maintenance department Maintenance department
True/False
Question This question refers to 'Automotive Gears Private Limited' : The
table given in the case study gives approximate machine hourrate for each indicated machine
Correct Answer True
Your Answer True
True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Project duration can always be reduced by deploying additionalrecourses
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question This Question refers to the case of 'Kerson Automobiles' :The
option of shifting the workshop to another location at theoutskirts of the city was shelved because :-
Correct Answer Company was likely to lose business of spare parts and service
of old carsYour Answer Company was likely to lose business of spare parts and service
of old cars
Select The Blank
Question This Question refers to the case 'Indus Foundries Ltd.' :Industrial
relations climate at all the proposed locations is forproduction
Correct Answer Conductive
Trang 13Your Answer Conductive
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Kerson Automobiles' : The
huge work table placed outside the machine shop can be used
to carry out Correct Answer Debarring work , Cleaning work , Filing work
:-Your Answer Filing work , Debarring work , Cleaning work
Multiple Choice Single Answer
Question This Question refers to the case 'Suyog Udyog' : The proprietor
is a Correct Answer Technical person
:-Your Answer Technical person
True/False
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : "It is difficult to install an incentive scheme and easy towithdraw when desired."
Correct Answer False
Your Answer False
Select The Blank
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Success of wage incentive plans to a large extentdepends on the of performance standards
Correct Answer Quality
Your Answer Quality
Multiple Choice Single Answer
Question This question refers to 'Automotive Gears Private Limited' : It
manufactures a wide variety of Correct Answer Gears & shafts
:-Your Answer Gears & shafts
Multiple Choice Multiple Answer
Question This Question refers to the case 'Indus Foundries Ltd.' :Following
items are readily available at all the three locations Correct Answer Raw materials , Scrap , Foundry chemicals
:-Your Answer Raw materials , Scrap , Foundry chemicals
Trang 14Select The Blank
Question This Question refers to the case of 'The Irate Vendor' : Jones
had been brought in by a management consultant to the department's buying activities
Correct Answer Centralize
Your Answer Centralize
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' :Kalpak
Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt In the manufacturing process grindingoperation is carried out on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Artwood Products' : The cost
of manufacturing has increased due to Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time
:-, Poor quality of productsYour Answer Blockage of funds in inventory , Longer manufacturing cycle time
, Poor quality of products
Multiple Choice Single Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
This case is on make-buy decision for an item Name of that item
is one of the below Correct Answer Exhaust Manifold
:-Your Answer Exhaust Manifold
Multiple Choice Single Answer
Question This Question refers to the case of 'The Geer Company' : The
purchase of steel was done exclusively by Correct Answer One buyer
:-Your Answer One buyer
Multiple Choice Multiple Answer
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : An incentive plan can be considered as a tool forfollowing:-
Correct Answer Increase productivity , Create more capacity , Reduce
manufacturing costsYour Answer Increase productivity , Create more capacity , Reduce
manufacturing costs
Trang 15Match The Following
Question Correct Answer Your Answer
Inspection Dimensional accuracy Dimensional accuracy
The question refer to the
case on 'Kalpak
Engineers' : First
operation
Consecutive operations Copy turning machine Copy turning machineLast machining operation Thread rolling Thread rolling
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : In the
case for all machining operations following data on time isfurnished:-
Correct Answer Setup time and standard time separately
Your Answer Setup time and standard time separately
Select The Blank
Question This Question refers to the case 'Suyog Udyog' : Number of work
stations are to be decided based on assumption that monthly offtake is numbers
Correct Answer 8000
Your Answer 8000
Select The Blank
Question This question refer to the case on "Allied Industries Pvt Ltd" :
Allied Industries Pvt ltd is a small concern with 25workmen
Correct Answer Proprietary
Your Answer Proprietary
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Narmada Electricals Ltd.' :
Production or Quality department decide when these becomesurplus/obsolete :-
Correct Answer Part , Component , Item
Your Answer Part , Component , Material
Trang 16Multiple Choice Single Answer
Question This Question refers to the case of 'Northern Machinery Limited'
: Vice President ( Commercials) called the Materials Manager
Mr Khan and informed him that an anonymous letter wasreceived which mentioned :-
Correct Answer Corruption in purchase department
Your Answer Corruption in purchase department
Select The Blank
Question This question refers to 'Automotive Gears Private Limited' : The
company produces items for manufacturers
Correct Answer Automobile
Your Answer Gear
Multiple Choice Multiple Answer
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following are some of the shortcomings of scanlonplan:-
Correct Answer It rewards workers even if increase in sales is due to factor like
price increase , The plan does not recognize individual efforts ,The increase in labour cost due to wage agreement may result inlesser incentive bonus to the workmen
Your Answer It rewards workers even if increase in sales is due to factor like
price increase , The plan does not recognize individual efforts ,The increase in labour cost due to wage agreement may result inlesser incentive bonus to the workmen , The plan is very
complex to administer
Select The Blank
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : In Scanlon Plan all employees receive guaranteed wages
Correct Answer Time
Your Answer Minimum
True/False
Question This Question refers to the case of 'K.T Gears' : The activities
performed by the operator are listed on the practitioner's datasheet
Correct Answer True
Your Answer True
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is
economical to continue subcontracting the machining of Exhaust
Trang 17Manifold to vendors.
Correct Answer False
Your Answer True
Select The Blank
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Duration of project can be reduced if duration of an activity on path is reduced
Correct Answer Critical
Your Answer Critical
Select The Blank
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
Enroute to Delhi, the truck collided with an incoming .Correct Answer Tractor Trailer
Your Answer Tractor Trailer
True/False
Question This Question refers to 'Uday Electroplating Shop' : As per cost
figures collected, Expected volume of work on special equipmentnext year is 10,000 Nos
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
After completion of manufacturing, Jay Jee took following actions:-
Correct Answer Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount , Did not send theconsignment by Hansa's designated carrier
Your Answer Dispatched the consignment by Express Roadlines by truck , Did
not send the consignment by Hansa's designated carrier
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : Process
sheet does not provide following Correct Answer Shift
data:-Your Answer Shift
Multiple Choice Single Answer
Trang 18Question This Question refers to the case 'Suyog Udyog' : Balancing
weights are manufactured using facilities arranged in Correct Answer Process type of layout
:-Your Answer Process type of layout
Multiple Choice Single Answer
Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The company is manned by Correct Answer Professional managers
:-Your Answer Professional managers
Multiple Choice Multiple Answer
Question This Question refers to the case 'Indus Foundries Ltd.':The
location of plant has been narrowed down to following locations:-
Correct Answer Kolhapur , Ahmedabad , Coimbatore
Your Answer Kolhapur , Ahmedabad , Coimbatore
Multiple Choice Multiple Answer
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following are the some of the important features ofincentive plans:-
Correct Answer Method of calculating incentive , Period of payment ,
Determination of performance standardYour Answer Method of calculating incentive , Basis of wage payment ,
Determination of performance standard
Multiple Choice Single Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Weldtech India Private Ltd proposes to manufacture followingproducts:-
Correct Answer General purpose welding electrodes
Your Answer General purpose welding electrodes
Select The Blank
Question This Question refers to the case of 'Kerson Automobiles' :
Haphazard parking of cars inside the workshop, leads to movements
Correct Answer Unproductive
Your Answer Unproductive
Multiple Choice Multiple Answer
Trang 19Question This Question refers to the case 'Quality Gauges Pvt Ltd.' : The
consultant made following recommendations Correct Answer Creation of industrial engineering department , Methods
:-improvement & fixation of performance standards , Introduction
of incentive schemeYour Answer Creation of industrial engineering department , Methods
improvement & fixation of performance standards , Introduction
of incentive scheme
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production Correct Answer Routing
planning:-Your Answer Routing
True/False
Question This question refers to the case of 'Northern Machinery Ltd' : As
per summary of purchases of the last year, Material cost as aproportion of sales is 26%
Correct Answer False
Your Answer False
Trang 20Cases in operation mgmt ALPANA
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is economical to continue subcontracting the machining of Exhaust Manifold to vendors.
Correct Answer False
Your Answer True
True/False
Question This Question refers to the case of National Engineering Co.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Following is One apparent saving if the machining is done at the company's own plant:-
Correct Answer Sale of scrap
Your Answer Transport cost
Multiple Choice Single Answer
Question This Question refers to the case of 'The Geer Company' : The purchase of steel was done exclusively by
:-Correct Answer One buyer
Your Answer One buyer
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Gujrat Engineering company Limited' : The forged cylinder ordered on new vendor Correct Answer Was received on schedule , Was priced 15 % lower than the price of the previous supplier , Had missed out carrying out some machining operations
:-Your Answer Was received on schedule , Was priced 15 % lower than the price of the previous supplier , Had missed out carrying out some machining operations
Multiple Choice Multiple Answer
Question This question refer to the case on "Allied Industries Pvt Ltd" : Variable cost consists of the following
:-Correct Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
Your Answer Employee cost , Cost of a pair thread roll , Regrinding charges on thread roll
Select The Blank
Question This question refers to 'Automotive Gears Private Limited' : The case study requires calculation of set up for the job Correct Answer Cost
Your Answer Feature
Match The Following
Question Correct Answer Your Answer
Shop floor mangers pressurized to give Overtime Lot of effort
This Question refers to the case 'Quality Gauges Pvt Ltd.' : Qualifying amount shall be raised with Increase in sales price Total output in terms of value of production
Incentive will be paid on Basic salary of each employee Increase in sales price
Basis of payment on Total output in terms of value of production Basic salary of each employee
Multiple Choice Single Answer
Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The table given in the case study gives details of activities and expected time for the same It requires construction of :-
Correct Answer Network diagram of the activities
Your Answer Network diagram of the activities
Match The Following
Question Correct Answer Your Answer
Equipment cost Capital recovery factor Threaded nut
This question refer to the case on "Allied Industries Pvt Ltd." : Variable cost Power cost Power cost
Fixed cost Space cost Capital recovery
Item Sealing pump Sealing pump
Select The Blank
Question This Question refers to the case of 'The Geer Company' : The volume of growth tripled due to management Correct Answer Aggressive
Trang 21Your Answer Aggressive
Multiple Choice Single Answer
Question This Question refers to the case of 'K.T Gears' : One of the operations recently studied by the methods study practitioner at this company concerns is :-
Correct Answer Cutting of groove in a sliding gear
Your Answer Cutting of groove in a sliding gear
Multiple Choice Single Answer
Question This Question refers to the case of 'Kerson Automobiles' : It was decided to modify the existing layout of the plant in the year Correct Answer 1972
:-Your Answer 1972
True/False
Question This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry out modification of existing plant.
Correct Answer True
Your Answer True
Select The Blank
Question This Question refers to the case of 'The Gujrat Engineering company Limited' : A compromise was finally reached in which the supplier agreed to the cancellation charges.
Correct Answer Withdraw
Your Answer Absorb
Multiple Choice Multiple Answer
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Following are some of the shortcomings of scanlon Correct Answer It rewards workers even if increase in sales is due to factor like price increase , The plan does not recognize individual efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen
plan:-Your Answer It rewards workers even if increase in sales is due to factor like price increase , The plan does not recognize individual efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen
True/False
Question This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer True
Your Answer True
True/False
Question This Question refers to the case of 'Narmada Electricals Ltd.' :The rates of scrap were reviewed from time to time.
Correct Answer False
Your Answer True
Select The Blank
Question This Question refers to the case of 'Eagle Machine Company' : The purchase department is responsible only for buying and .
Correct Answer Expediting
Your Answer Inspection
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Geer Company' : Problems got created due to
:-Correct Answer Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Multiple Choice Single Answer
Question This Question refers to the case of 'National Engineering Co' : GM commented that every department in this company
competes with others in matter of
:-Correct Answer Inefficiency
Your Answer Inefficiency
Multiple Choice Single Answer
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive schemes can not be considered to be a substitute of the following:-
Correct Answer Poor management
Your Answer Low manufacturing cost
True/False
Question This Question refers to the case 'Indus Foundries Ltd.' : Skilled manpower at worker level is not available in plenty at Kolhapur Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Presently the raw castings are procured by UTPL and given to machining to three vendors If UTPL has to manufacture Exhaust Manifold in house it would have to provide one of the following:
Correct Answer New jigs and fixtures
Trang 22Your Answer Additional machines
Select The Blank
Question This Question refers to the case of 'K.T Gears' : The cycle time per piece to perform the set of activities listed adds up to .
Correct Answer 2.30 minutes
Your Answer 1.9 minutes
Multiple Choice Multiple Answer
Question This question refers to 'Automotive Gears Private Limited' : The spline Grinding machine is used for operation
:-Correct Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline Grind (section'CC')
Your Answer Spline Grind (section'AA') , Spline Grind (section'BB')
Select The Blank
Question This Question refers to the case of 'Eagle Machine Company' : The Marketing Manager the finished stock.
Correct Answer Controls
Your Answer Buys
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Artwood Products' : The product range includes
:-Correct Answer Sofa , Dressing tables , Office tables
Your Answer Office tables , Sofa
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The cost of foundry reject is borne by the company.
Correct Answer True
Your Answer True
Select The Blank
Question The question refer to the case on 'Kalpak Engineers' : Raw material in the form of bar stock is supplied by the Correct Answer Customer
Your Answer Stockiest
Multiple Choice Single Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Use of Network Techniques beside computing project
duration also helps in the following
:-Correct Answer Possibilities of reducing project duration
Your Answer Computing manpower requirement
Multiple Choice Single Answer
Question This Question refers to the case of 'Eagle Machine Company' : The company is facing following problem
:-Correct Answer Sales are declining
Your Answer Sales are declining
Multiple Choice Multiple Answer
Question This Question refers to the case 'Quality Gauges Pvt Ltd.' : The consultant made following recommendations
:-Correct Answer Creation of industrial engineering department , Methods improvement & fixation of performance standards , Introduction
of incentive scheme
Your Answer Creation of industrial engineering department , Methods improvement & fixation of performance standards , Introduction of incentive scheme
Multiple Choice Single Answer
Question This Question refers to the case of 'National Engineering Co.' : As per GM, the route cause of this non-sensical situation is lack
of
:-Correct Answer Co-ordination
Your Answer Co-ordination
Select The Blank
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in completion of would increase Project cost.
Correct Answer Project
Your Answer Indirect
Select The Blank
Question This Question refers to the case of 'The Irate Vendor' : As per Jones, the new procedures were sound.
Correct Answer Purchasing
Your Answer Quality
True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus based on individual efforts and additional output.
Correct Answer True
Your Answer True
Select The Blank
Trang 23Question This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder mounted on the huge work table, gives out and blows out dust.
Correct Answer Sparks
Your Answer Smells
True/False
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr Sen was informed by Mr Ravikant, Materials Manager that counting is not necessary at every stage as they count at the initial stage and since their workers and supervisors are experienced, they can easily identify the components at each stage of production.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Irate Vendor' : The President's memorandum says
:-Correct Answer We have treated this supplier unfairly , He would like to see if his complaint is justified , The Vendor's letter suggests that we do not have a policy on evaluating our vendors
Your Answer We have treated this supplier unfairly , He would like to see if his complaint is justified , The Vendor's letter suggests that
we do not have a policy on evaluating our vendors
Select The Blank
Question This Question refers to the case 'Quality Gauges Pvt Ltd.' : The agreement mentioned that Incentive amount will be paid along with .
Correct Answer Wages
Your Answer Wages
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Gujrat Engineering company Limited' : The company has received a special order where :-
Correct Answer A special cylinder is to be manufactured , The item is to be manufactured from a hollow bored forging , Fastest delivery
is requested
Your Answer A special cylinder is to be manufactured , The item is to be manufactured from a hollow bored forging , Fastest delivery is requested
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.': The contract with Kay Jee Hydraulics Ltd was agreed with following terms & conditions :-
Correct Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after dispatch of material
Your Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after dispatch of material
Multiple Choice Single Answer
Question This Question refers to the case of 'Northern Machinery Limited' : Khan had used a paper to deliver a talk to his senior buyers This paper contained :-
Correct Answer Summary of purchases
Your Answer Summary of purchases
True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr Sharma, Production Engineer informed Mr Kaul that Hardening & Tempering was the last operation.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Following are the activities involved in employee selection for WIPL :-
Correct Answer Release of advertisement , Finalize job profile , Selecting candidates
Your Answer Release of advertisement , Finalize job profile , Selecting candidates
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following actions :-
Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
LIST OF ATTEMPTED QUESTIONS AND ANSWERS AMIT CHUG
Trang 24Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration can always be reduced by deploying
additional recourses.
Correct Answer False
Your Answer True
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As extra capacity can be generated by starting an additional shift, hence fixed overheads are sizable.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question This question refers to case on 'Morbay Engineering Works (MEW)' : The success of an incentive plan to a large extent depends on the following factor:-
Correct Answer Quality of performance standard
Your Answer Production Planning and Control system
Select The Blank
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : In order to save time in construction the management purchased a .
Correct Answer Factory-building
Your Answer Godown
Multiple Choice Multiple Answer
Question This Question refers to the case of National Engineering Co.
Correct Answer Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
True/False
Question This Question refers to the case 'Suyog Udyog' : The operation time for C' sunk 14 dia holes on both sides is 0.50 per piece Correct Answer True
Your Answer True
Select The Blank
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Duration of project can be reduced if duration of an activity on path is reduced.
Correct Answer Critical
Your Answer Non critical
Select The Blank
Question This Question refers to the case of 'Artwood Products' : Entire shop floor was due to piles of work in progress Correct Answer Congested
Your Answer Overflowing
Multiple Choice Single Answer
Question This Question refers to the case 'Indus Foundries Ltd.': The company is faced with following problems
:-Correct Answer Choice of Location
Your Answer Choice of Location
True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Work sampling and production studies can be used to test viability of the performance standards.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : This company was acquired by Das Group of Industries Mr Mohit Sen,(head of Business planning function in the corporate office) was visiting the factory as its :-
Correct Answer Turn over was stagnating
Your Answer Turn over was stagnating
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Northern Machinery Limited' : The writer of anonymous letter
:-Correct Answer Is a share holder of the company , Has the interest of the shareholders of the company , Wants the Company to put a stop before it is too late
Your Answer Is a share holder of the company , Has the interest of the shareholders of the company , Wants the Company to put a stop before it is too late
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following actions :-
Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Trang 25Your Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Narmada Electricals Ltd.' : Other material considered to be scrap/obsolete is
:-Correct Answer Packing material , Maintenance spares , Parts/components
Your Answer Packing material , Maintenance spares , Parts/components
True/False
Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The order has been finalized from a leading engineering firm.
Correct Answer False
Your Answer True
True/False
Question This Question refers to the case 'Indus Foundries Ltd.' : Skilled manpower at worker level is not available in plenty at Kolhapur Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Question The question refer to the case on 'Kalpak Engineers' : For manufacturing Stay Bolt following machines are
planned:-Correct Answer Copying Lathe , Radial Drilling Machine , Thread Rolling machine
Your Answer Turret Lathe , Copying Lathe , Radial Drilling Machine
True/False
Question This Question refers to the case of National Engineering Co.
Correct Answer False
Your Answer True
Select The Blank
Question This Question refers to the case of 'Kerson Automobiles' : Battery charger placed on one end of table creates Correct Answer Nuisance
Your Answer Nuisance
Select The Blank
Question This Question refers to the case 'Quality Gauges Pvt Ltd.' : The agreement mentioned that Incentive amount will be paid along with .
Correct Answer Wages
Your Answer Ex gratia
Multiple Choice Single Answer
Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The table given in the case study gives details of activities and expected time for the same It requires construction of :-
Correct Answer Network diagram of the activities
Your Answer Network diagram of the activities
Select The Blank
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : Enroute to Delhi, the truck collided with an incoming Correct Answer Tractor Trailer
Your Answer Contract Bus
Multiple Choice Single Answer
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Customers complaints were on the rise, mainly due to :-
Correct Answer Delay in deliveries
Your Answer Delay in deliveries
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Kerson Automobiles' : As per consultants, problems are due to following reasons
:-Correct Answer Material flow (Cars) is not smooth , A major chunk of productive time is lost in obtaining replacement of spares from stores , Too often, helpers are found busy in transferring parts from work table to a hand trolley.
Your Answer Material flow (Cars) is not smooth , A major chunk of productive time is lost in obtaining replacement of spares from stores , Too often, helpers are found busy in transferring parts from work table to a hand trolley.
Match The Following
Question Correct Answer Your Answer
Responsibility for Monthly report on any rejected/obsolete/non-moving items Production /Marketing department Store Manager
This Question refers to the case of 'Narmada Electricals Ltd.' : Decision whether material is obsolete or otherwise Store Manager With held for the time being
Disposal of waste/obsolete material Once a year Three times a year
Storage of scrap material in scrap yard Without identification or any records of quantities Production /Marketing department
Trang 26Multiple Choice Single Answer
Question This Question refers to the case 'Indus Foundries Ltd.':Parveen Kumar proposed to set up a
:-Correct Answer Cast Iron foundry
Your Answer Cast Iron foundry
Match The Following
Question Correct Answer Your Answer
Anonymous letter received by M.D Need to justify Seen in top hotels with suppliers
This question refers to the case of 'Northern Machinery Ltd.' : Senior buyers Seen in top hotels with suppliers Need to be concise and to the point
Reason for failure to convince the Board of Directors No material facts to support the arguments No material facts to support the
arguments
Lot of items on the agenda Need to be concise and to the point No confidence in Material manager and Senior buyers
Select The Blank
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime must be to guarantee the success of the wage incentive scheme.
Correct Answer Eliminative
Your Answer Controlled
Multiple Choice Single Answer
Question This Question refers to the case of 'Northern Machinery Limited' : Vice President ( Commercials) called the Materials Manager
Mr Khan and informed him that an anonymous letter was received which mentioned
:-Correct Answer Corruption in purchase department
Your Answer Corruption in purchase department
Multiple Choice Multiple Answer
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Following are the some of the important features of incentive plans:-
Correct Answer Method of calculating incentive , Period of payment , Determination of performance standard
Your Answer Method of calculating incentive , Period of payment , Basis of wage payment
Multiple Choice Single Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Use of Network Techniques beside computing project duration also helps in the following :-
Correct Answer Possibilities of reducing project duration
Your Answer Computing manpower requirement
Multiple Choice Single Answer
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive schemes can not be considered to be a substitute of the following:-
Correct Answer Poor management
Your Answer Low manufacturing cost
Select The Blank
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In machining Exhaust Manifold, no cutting oil is required as the material is .
Correct Answer Cast iron
Your Answer Steel
Multiple Choice Single Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If annual requirement of finished part is 20,000 nos and machine rejection allowance is 5% The cost of casting for the Exhaust Manifold is Rs.10/unit And value of scrap is 3000 Rs.The material cost if the Exhaust Manifold is manufactured in-house is (figures assumed):-
Correct Answer Rs 207,000
Your Answer Rs 197,000
Multiple Choice Multiple Answer
Question This Question refers to the case of 'K.T Gears' : The firm is
:-Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear
Multiple Choice Multiple Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is manufactured in house, following costs wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Trang 27Multiple Choice Multiple Answer
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : The company supplies components to
:-Correct Answer Automobile industries , Printing machines , Machine tool & process equipment industries
Your Answer Automobile industries , Printing machines , Machine tool & process equipment industries
Multiple Choice Multiple Answer
Question The question refer to the case on 'Kalpak Engineers' : Following are the operations involved in manufacturing stay bolt in the case:-
Correct Answer Copy turning , Thread Rolling , Drilling
Your Answer Threading , Copy turning , Thread Rolling
Multiple Choice Single Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : The company contracted with Kay Jee Hydraulics Ltd Bombay for supply of :-
Correct Answer Filtering & Transfer machines
Your Answer Filtering & Transfer machines
Multiple Choice Single Answer
Question This Question refers to the case of 'The Irate Vendor' : The supplier's bid was not accepted because
:-Correct Answer It was not the lowest
Your Answer It was not the lowest
Multiple Choice Multiple Answer
Question This question refers to 'Automotive Gears Private Limited' : For Hob splines Operations, it uses
:-Correct Answer Cleaveland Hobbing machine , Newark Hobbing machine , Thread Milling machine
Your Answer Cleaveland Hobbing machine , Newark Hobbing machine , Thread Milling machine
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt In the manufacturing process grinding operation is carried out on following machine
:-Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder
Select The Blank
Question This Question refers to the case of 'Universal Fasteners Ltd.' : In the tempering process of studs, the was reduced
to 25-28 HRC.
Correct Answer Hardness
Your Answer Thickness
True/False
Question This question refers to the case of 'Northern Machinery Ltd' : As per summary of purchases of the last year, Material cost as a proportion of sales is 26%.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : In the case for all machining operations following data on time is furnished:-
Correct Answer Setup time and standard time separately
Your Answer Setup time and standard time separately
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : Process sheet does not provide following
data:-Correct Answer Shift
Your Answer Shift
LIST OF ATTEMPTED QUESTIONS AND ANSWERS MAYANK GOYAL
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : This case is concerned with following element of production Correct Answer Routing
planning:-Your Answer Routing
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Geer Company' : Problems got created due to
:-Correct Answer Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Multiple Choice Single Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Power consumption cost is considered as
:-Correct Answer Variable overhead cost
Your Answer Fixed Cost
True/False
Question This Question refers to the case 'Quality Gauges Pvt Ltd.' : The executives were entitled for incentive bonus.
Trang 28Correct Answer True
Your Answer True
True/False
Question This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data sheet.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : project planning/scheduling techniques are called by following names:-
Correct Answer CPM , PERT , Network Analysis
Your Answer CPM , PERT , Network Analysis
Multiple Choice Single Answer
Question This Question refers to the case of 'Northern Machinery Limited' : Materials Manager informed V.P that the letter must have been written by supplier affected by :-
Correct Answer New buying policies
Your Answer New buying policies
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : The company supplies components to
:-Correct Answer Automobile industries , Printing machines , Machine tool & process equipment industries
Your Answer Automobile industries , Printing machines , Machine tool & process equipment industries
True/False
Question This Question refers to the case of 'The Irate Vendor' : The President knows that some changes in purchasing policy are being planned.
Correct Answer True
Your Answer True
Select The Blank
Question This Question refers to the case of 'Artwood Products' : Entire shop floor was due to piles of work in progress Correct Answer Congested
Your Answer Congested
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The cost of foundry reject is borne by the company.
Correct Answer True
Your Answer True
True/False
Question This Question refers to the case of 'Narmada Electricals Ltd.' :The rates of scrap were reviewed from time to time.
Correct Answer False
Your Answer False
Match The Following
Question Correct Answer Your Answer
Shop floor mangers pressurized to give Overtime Lot of effort
This Question refers to the case 'Quality Gauges Pvt Ltd.' : Qualifying amount shall be raised with Increase in sales price Increase in sales price
Incentive will be paid on Basic salary of each employee Overtime
Basis of payment on Total output in terms of value of production Basic salary of each employee
Select The Blank
Question This Question refers to the case of 'Artwood Products' : The furniture is sold through distributors.
Correct Answer Standard
Your Answer Made to order
Select The Blank
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs and fixtures once provided will be able to maintain accuracy
up to about pieces.
Correct Answer 20000
Your Answer 5000
Select The Blank
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Success of wage incentive plans to a large extent depends on the of performance standards.
Correct Answer Quality
Trang 29Your Answer Quality
Select The Blank
Question This Question refers to the case of 'Kerson Automobiles' : Battery charger placed on one end of table creates Correct Answer Nuisance
Your Answer Nuisance
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The new items contracted by the company are handled
by the development department for
:-Correct Answer Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful development
Your Answer Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular production, after successful development
Select The Blank
Question This Question refers to the case 'Indus Foundries Ltd.' :Industrial relations climate at all the proposed locations is for production.
Correct Answer Conductive
Your Answer Favourable
Multiple Choice Multiple Answer
Question The question refer to the case on 'Kalpak Engineers' : Following are the operations involved in manufacturing stay bolt in the case:-
Correct Answer Copy turning , Thread Rolling , Drilling
Your Answer Copy turning , Thread Rolling , Drilling
True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus based on individual efforts and additional output.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This Question refers to the case 'Indus Foundries Ltd.':The location of plant has been narrowed down to following locations Correct Answer Kolhapur , Ahmedabad , Coimbatore
:-Your Answer Kolhapur , Ahmedabad , Coimbatore
Multiple Choice Single Answer
Question This Question refers to the case of 'The Gujrat Engineering company Limited' : The company also executes
:-Correct Answer Rush orders
Your Answer Rush orders
Select The Blank
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive scheme is a tool to create capacity, increase productivity and reduce manufacturing costs.
Correct Answer More
Your Answer Additional
Multiple Choice Multiple Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is to be manufactured in house, following are the requirements:-
Correct Answer Additional manpower , New jigs and fixtures , Additional shift
Your Answer New jigs and fixtures , Additional shift , Additional manpower
Multiple Choice Single Answer
Question This Question refers to the case of 'Eagle Machine Company' : The company is facing following problem
:-Correct Answer Sales are declining
Your Answer Sales are declining
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the Activity description given in the table, Preparation of operational layout activity affects following activities :-
Correct Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
Your Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
Match The Following
Question Correct Answer Your Answer
Inspection Dimensional accuracy Copy turning machine
The question refer to the case on 'Kalpak Engineers' : First operation Saw off Saw off
Consecutive operations Copy turning machine Grinding
Trang 30Last machining operation Thread rolling Sampling
Multiple Choice Multiple Answer
Question This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily available at all the three locations Correct Answer Raw materials , Scrap , Foundry chemicals
:-Your Answer Raw materials , Scrap , Foundry chemicals
Multiple Choice Multiple Answer
Question This Question refers to 'Uday Electroplating Shop' : It is a small Proprietary concern and
:-Correct Answer Has only three employees , Only one has knowledge and skill of electroplating , Workmen work for max 61/2 hours Your Answer Has only three employees , Only one has knowledge and skill of electroplating , Workmen work for max 61/2 hours True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration can always be reduced by deploying
additional recourses.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Weldtech India Private Ltd proposes to manufacture following products:-
Correct Answer General purpose welding electrodes
Your Answer General purpose welding electrodes
Multiple Choice Single Answer
Question This Question refers to the case of 'Universal Fasteners Ltd.' : Heat Treatment process for the studs involves two operations viz :-
Correct Answer Hardening & Tempering
Your Answer Hardening & Tempering
Multiple Choice Single Answer
Question This Question refers to the case 'Indus Foundries Ltd.' :In the proposed plant, heating of charge is to be done by
:-Correct Answer Induction furnace
Your Answer Induction furnace
Select The Blank
Question This Question refers to the case of 'Narmada Electricals Ltd.' : The disposal of material was done on basis.
Correct Answer Weight
Your Answer Piece rate
Multiple Choice Single Answer
Question This Question refers to the case of 'Autogears Private Limited' : The management is interested in the following
:-Correct Answer Improved method of working
Your Answer Improved method of working
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr Banerjee, Manager Quality informed Mr.Kaul that
:-Correct Answer Raw Material received was without test certificate and was not inspected by the inspector , Laid down procedure for processes of heat treatment, painting etc are not followed due to heavy labour turnover and frequent work allocation , Management has been requested to get the crack detection machine repaired.
Your Answer Raw Material received was without test certificate and was not inspected by the inspector , Laid down procedure for processes of heat treatment, painting etc are not followed due to heavy labour turnover and frequent work allocation , Management has been requested to get the crack detection machine repaired.
Multiple Choice Single Answer
Question This Question refers to the case of 'Kerson Automobiles' : Cars are manually pushed over the wooden stand placed in the major repairs section because of :-
Correct Answer Absence of the underground pit
Your Answer Absence of the underground pit
Multiple Choice Multiple Answer
Question The question refer to the case on 'Kalpak Engineers' : For manufacturing Stay Bolt following machines are
planned:-Correct Answer Copying Lathe , Radial Drilling Machine , Thread Rolling machine
Your Answer Copying Lathe , Radial Drilling Machine , Thread Rolling machine
True/False
Question This Question refers to the case of Narmada Electricals Ltd Mr Jain proposed that for accounting of material, and to carry out other task, two additional clerks shall be recruited
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : For calculating fixed labour cost following data is Correct Answer Set up time for operation , Labour hour rate , No of production runs per year
Trang 31required:-Your Answer Set up time for operation , Labour hour rate , No of production runs per year
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.': The contract with Kay Jee Hydraulics Ltd was agreed with following terms & conditions :-
Correct Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after dispatch of material
Your Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after dispatch of material
Multiple Choice Single Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The management of WIPL is deeply concerned about early completion of the project as delays in execution would result in the following:-
Correct Answer Delayed entry of product in the market
Your Answer Delayed entry of product in the market
Select The Blank
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In machining Exhaust Manifold, no cutting oil is required as the material is .
Correct Answer Cast iron
Your Answer Cast iron
Multiple Choice Single Answer
Question This Question refers to the case of 'Kerson Automobiles' :The option of shifting the workshop to another location at the outskirts of the city was shelved because :-
Correct Answer Company was likely to lose business of spare parts and service of old cars
Your Answer Company was likely to lose business of spare parts and service of old cars
Select The Blank
Question This question refers to 'Automotive Gears Private Limited' : The company produces items for manufacturers Correct Answer Automobile
Your Answer Engine
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : Process sheet does not provide following
data:-Correct Answer Shift
Your Answer Shift
LIST OF ATTEMPTED QUESTIONS AND ANSWERS ASHISH MEHTA
Multiple Choice Single Answer
Question This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is considered while calculating total cost
of buying
:-Correct Answer Transport cost
Your Answer Transport cost
Select The Blank
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr Sen observed that the Machine Shop was looking .
Correct Answer Congested
Your Answer Neat
Multiple Choice Single Answer
Question This Question refers to the case of 'Kerson Automobiles' : Distance traveled every day, by a mechanic to get replacement from stores is :-
Correct Answer 4 to 6 miles
Your Answer 4 to 6 miles
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : In the case for all machining operations following data on time is furnished:-
Correct Answer Setup time and standard time separately
Your Answer Setup time and standard time separately
True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Installation of machine should follow recruitment of workmen Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Following are some of the shortcomings of scanlon
Trang 32plan:-Correct Answer It rewards workers even if increase in sales is due to factor like price increase , The plan does not recognize individual efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen
Your Answer It rewards workers even if increase in sales is due to factor like price increase , The plan does not recognize individual efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen
Multiple Choice Single Answer
Question This question refers to case on 'Morbay Engineering Works (MEW)' : One of the most popular and widely used incentive plan
is called by following
name:-Correct Answer Scanlon Plan
Your Answer Maslow plan
True/False
Question This Question refers to 'Uday Electroplating Shop' : As per cost figures collected, Expected volume of work on special
equipment next year is 10,000 Nos.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This Question refers to the case 'Indus Foundries Ltd.':The location of plant has been narrowed down to following locations Correct Answer Kolhapur , Ahmedabad , Coimbatore
:-Your Answer Kolhapur , Ahmedabad , Coimbatore
Select The Blank
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : Enroute to Delhi, the truck collided with an incoming Correct Answer Tractor Trailer
Your Answer Tractor Trailer
Question This question refer to the case on "Allied Industries Pvt Ltd" :Capital recovery per annum is an element of fixed cost.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : The company specializes in manufacturing Correct Answer Precision machined components
:-Your Answer Precision machined components
True/False
Question This Question refers to the case of 'Eagle Machine Company' : The company buys a variety of material, ranging from a few ponds of rare metals to sizable quantities of sheet metal.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Eagle Machine Company' : Cost of running Sally's department is Rs 3,70,000 per year This is on account of :-
Correct Answer Salaries , Fringes , Expenses
Your Answer Salaries , Fringes , Expenses
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Cost of reject above 5% machining rejection is borne by the vendor.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt In the manufacturing process grinding operation is carried out on following machine
:-Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Northern Machinery Limited' : The writer of anonymous letter
:-Correct Answer Is a share holder of the company , Has the interest of the shareholders of the company , Wants the Company to put a stop before it is too late
Your Answer Is a share holder of the company , Has the interest of the shareholders of the company , Wants the Company to put a stop before it is too late
Multiple Choice Single Answer
Trang 33Question This Question refers to the case of 'Divgi Metalwares Private Limited' : It is a
:-Correct Answer Light engineering company
Your Answer Heavy engineering company
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Geer Company' : The problems reported are
:-Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect ordering quantities
Your Answer Delays in placing orders , Frequently late deliveries , Incorrect ordering quantities
Multiple Choice Single Answer
Question This Question refers to the case 'Suyog Udyog' : The proprietor is a
:-Correct Answer Technical person
Your Answer Technical person
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : This case is concerned with following element of production Correct Answer Routing
planning:-Your Answer Routing
Multiple Choice Multiple Answer
Question This Question refers to the case of 'The Irate Vendor' : The old supplier
:-Correct Answer Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid
Your Answer Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no chance has been given to him to discuss his bid
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is economical to continue subcontracting the machining of Exhaust Manifold to vendors.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question This Question refers to the case of National Engineering Co.
Correct Answer Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Your Answer Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the consignment by Hansa's designated carrier
Multiple Choice Multiple Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is to be manufactured in house, following are the requirements:-
Correct Answer New jigs and fixtures , Additional shift , Additional manpower
Your Answer New jigs and fixtures , Additional shift , Additional manpower
Multiple Choice Single Answer
Question This Question refers to the case 'Quality Gauges Pvt Ltd.' : The union, in a meeting with the management opposed the fixation
of performance standards on the ground that
:-Correct Answer It was never heard of
Your Answer It was never heard of
Select The Blank
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Many incentives schemes fail in their due to 'loose standards'.
Correct Answer Objectives
Your Answer Goal
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Kerson Automobiles' : The huge work table placed outside the machine shop can be used
to carry out
:-Correct Answer Filing work , Debarring work , Cleaning work
Your Answer Filing work , Debarring work , Cleaning work
Multiple Choice Single Answer
Question This Question refers to the case of 'National Engineering Co' : GM commented that every department in this company
competes with others in matter of
:-Correct Answer Inefficiency
Your Answer Inefficiency
True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : "It is difficult to install an incentive scheme and easy to withdraw when desired."
Correct Answer False
Your Answer True
Trang 34Select The Blank
Question This Question refers to the case 'Suyog Udyog' : Number of work stations are to be decided based on assumption that monthly off take is numbers.
Correct Answer False
Your Answer False
Select The Blank
Question This question refers to case on 'Morbay Engineering Works (MEW)' : In Scanlon Plan all employees receive guaranteed wages.
Correct Answer Time
Your Answer Minimum
True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The management knew the activities involved, their durations and interrelationship, still are not in position to tell when the project will be completed.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question This Question refers to the case 'Indus Foundries Ltd.': The company is faced with following problems
:-Correct Answer Choice of Location
Your Answer Choice of Location
Multiple Choice Multiple Answer
Question This Question refers to the case 'Suyog Udyog' : Operation details are as follows
:-Correct Answer Drill and ream 3 holes, 14 mm dia , Deburr , Mill 2 slots 28 mm wide
Your Answer Drill and ream 3 holes, 14 mm dia , Deburr , Mill 2 slots 28 mm wide
True/False
Question This Question refers to the case of 'Kerson Automobiles' : Some areas can not be used because of odour emanating from adjoining two painting bays.
Correct Answer True
Your Answer True
Select The Blank
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Duration of project can be reduced if duration of an activity on path is reduced.
Correct Answer Critical
Your Answer Critical
Multiple Choice Multiple Answer
Question This Question refers to 'Uday Electroplating Shop' : It is a small Proprietary concern and
:-Correct Answer Has only three employees , Only one has knowledge and skill of electroplating , Workmen work for max 61/2 hours Your Answer Has only three employees , Only one has knowledge and skill of electroplating , Workmen work for max 61/2 hours Select The Blank
Question This Question refers to the case of 'Eagle Machine Company' : The Marketing Manager the finished stock.
Correct Answer Controls
Your Answer Controls
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The average efficiency on the other components currently being produced is around 75%.
Correct Answer True
Your Answer True
Select The Blank
Question This Question refers to the case of 'The Irate Vendor' : Jones had been brought in by a management consultant to the department's buying activities.
Correct Answer Centralize
Your Answer Consolidate
Multiple Choice Multiple Answer
Question This question refers to 'Automotive Gears Private Limited' : For Hob splines Operations, it uses
:-Correct Answer Cleaveland Hobbing machine , Newark Hobbing machine , Thread Milling machine
Your Answer Cleaveland Hobbing machine , Newark Hobbing machine , Thread Milling machine
Match The Following
Question Correct Answer Your Answer
Trang 35Responsibility for Monthly report on any rejected/obsolete/non-moving items Production /Marketing department With held for the time being This Question refers to the case of 'Narmada Electricals Ltd.' : Decision whether material is obsolete or otherwise Store Manager Three times a year
Disposal of waste/obsolete material Once a year Once a year
Storage of scrap material in scrap yard Without identification or any records of quantities Store Manager
Multiple Choice Multiple Answer
Question This question refer to the case on "Allied Industries Pvt Ltd" : Variable cost consists of the following
:-Correct Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
Your Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
Match The Following
Question Correct Answer Your Answer
Equipment cost Capital recovery factor Power cost
This question refer to the case on "Allied Industries Pvt Ltd." : Variable cost Power cost Sealing pump
Fixed cost Space cost Threaded nut
Item Sealing pump Space cost
Trang 36Multiple Choice Single Answer
Question This Question refers to the case of 'The Gujrat
Engineering company Limited' : It is in the business of manufacturing of :-
Correct Answer Hydraulic pumps & equipment
Your Answer Hydraulic pumps & equipment
Multiple Choice Single Answer
Question This Question refers to the case of 'Kerson Automobiles'
:The management is worried about the following problem :-
Correct Answer Deteriorating after sales service
Your Answer Deteriorating after sales service
True/False
Question This Question refers to the case of Narmada Electricals
Ltd Mr Jain proposed that for accounting of material, and to carry out other task, two additional clerks shall be recruited
Correct Answer True
Your Answer True
Select The Blank
Question This question refers to case on 'Morbay Engineering
Works (MEW)' : Success of wage incentive plans to a large extent depends on the of performance standards.
Correct Answer Quality
Your Answer Quality
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established machine shop having more than 150 machines and :- Correct Answer A heat treatment shop , Metrology section , Packing
section Your Answer A heat treatment shop , Metrology section , Packing
section
Trang 37Question This Question refers to the case of 'Eagle Machine
Company' : The company buys a variety of material, ranging from a few ponds of rare metals to sizable quantities of sheet metal.
Correct Answer True
Your Answer True
True/False
Question This question refers to the case of 'Northern Machinery
Ltd' : As per summary of purchases of the last year, Material cost as a proportion of sales is 26%.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question This Question refers to the case 'Indus Foundries
Ltd.':The location of plant has been narrowed down to following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore
Your Answer Kolhapur , Ahmedabad , Coimbatore
Select The Blank
Question This Question refers to the case 'Quality Gauges Pvt.
Ltd.' : The agreement mentioned that Incentive amount will be paid along with .
Correct Answer Wages
Your Answer Wages
Multiple Choice Single Answer
Question This Question refers to the case of 'K.T Gears' :To study
the company's blanking operations to improve methods and fix labour performance standards, the company has constituted :-
Correct Answer An industrial engineering department
Your Answer An industrial engineering department
Multiple Choice Single Answer
Trang 38Question This Question refers to the case of 'National Engineering
Co.' : Mr Kher, Material Manager, had talked to supplier who agreed to take back the 2200 kgs of 22 A/F En 1 in stock at :-
Correct Answer The rate he sold to them
Your Answer The rate he sold to them
Select The Blank
Question This question refers to 'Automotive Gears Private
Limited' : The company produces items for manufacturers.
Correct Answer Automobile
Your Answer Gear
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' :
This case is concerned with following element of production planning:-
Correct Answer Routing
Your Answer Manufacturing Cost reduction
Multiple Choice Multiple Answer
Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : For calculating fixed labour cost following data
is Correct Answer Set up time for operation , Labour hour rate , No of
required:-production runs per year Your Answer Set up time for operation , Labour hour rate
True/False
Question This question refers to 'Automotive Gears Private
Limited' : The table given in the case study gives approximate machine hour rate for each indicated machine.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Trang 39Question This Question refers to the case of 'Narmada Electricals
Ltd.(NEL)' : Mr Ashok Rai, General Manager is concerned about stock of surplus/obsolete material :- Correct Answer Lyinig in stores
Your Answer Lying in shop floor
Multiple Choice Single Answer
Question This Question refers to the case of 'Northern Machinery
Limited' : Khan had used a paper to deliver a talk to his senior buyers This paper contained :-
Correct Answer Summary of purchases
Your Answer Summary of purchases
Multiple Choice Single Answer
Question This Question refers to the case of 'National Engineering
Co' : Mr Deo, Sales Manager argued that if Planning can supply on time, sales shall ensure that quantities
purchased are Correct Answer Higher
:-Your Answer Higher
Match The Following
Capacity cost Unabsorbed overheads Unabsorbed overheads This question refers to
case on 'Uma Tools Pvt
Ltd (UTPL)' : Power
cost
Variable over head Variable over head
Setup cost Fixed labour cost Direct cost
Select The Blank
Question This Question refers to the case of 'National Engineering
Co.' : GM commented that every department in this company competes with others in matter of Correct Answer Inefficiency
Trang 40Your Answer Inefficiency
Multiple Choice Single Answer
Question This Question refers to the case of Narmada Electricals
Ltd.(NEL) : This company is about 15 years old, manufactures electric motors and caters to the requirement of :-
Correct Answer Engineering industry and railways
Your Answer Engineering industry and railways
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : The cost of foundry reject is borne by the company.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers'
:Kalpak Engineers have contracted from a boiler company manufacturing of 500 nos of stay bolt In the manufacturing process grinding operation is carried out
on following machine Correct Answer Cylindrical grinder
:-Your Answer Cylindrical grinder
Select The Blank
Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : Fixed are to be computed only when machines need to be purchased.
Correct Answer Overhead
Your Answer Cost
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Kerson Automobiles'
: As per the MD, the company is faced with following problems :-
Correct Answer Union leaders do not work , Lower efficiency of the