PHẦN 1. CÁC CÔNG TÁC CHUẨN BỊ TRƯỚC KHI THI CÔNG PHẦN 2. THI CÔNG KẾT CẤU NHÀ CAO TẦNG Chương 1. Thi công móng và tường vây Chương 2. Thi công tầng hầm Chương 3. Lắp đặt vật tư, thiết bị xây dựng thi công nhà cao tầng PHẦN 3. HSE TRONG THI CÔNG NHÀ CAO TẦNG
Trang 1Ho Chi Minh City, Jan., 2015
Email: pda@AnPhong.vn Website: www.AnPhong.vn
AN PHONG
CONSTRUCTION METHOD
LOCATION: 168 PHAN VAN TRI, GO VAP DISTRICT, HO CHI MINH CITY
ADDRESS: UNIT 2008, 2009 STC BUILDING, 37 TON DUC THANG STREET, DISTRICT 1, HO CHI MINH CITY
CB-CNV SABECO
Trang 2AN PHONG
Q.2, TP.HCM DOCUMENT TYPE
CONSTRUCTION METHOD CB-CNV SABECO
Trang 3AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
Trang 4DATE: 25/12/2014SBCNT-AP-BPTC-
Trang 5DRAWING No:
25/12/2014SBCNT-AP-BPTC-
Trang 6DATE: 25/12/2014SBCNT-AP-BPTC-
Trang 7DRAWING No:
25/12/2014SBCNT-AP-BPTC-
Trang 8DATE: 25/12/2014SBCNT-AP-BPTC-
Trang 9AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
Trang 10DATE: 25/12/2014SBCNT-AP-BPTC-
Trang 11DRAWING No:
25/12/2014SBCNT-AP-BPTC-
Trang 12DATE: 25/12/2014SBCNT-AP-BPTC-
Trang 13DRAWING No:
25/12/2014SBCNT-AP-BPTC-
Trang 14DATE: 25/12/2014SBCNT-AP-BPTC-
Trang 15DRAWING No:
25/12/2014SBCNT-AP-BPTC-
Trang 16AN PHONG
Q.2, TP.HCM DOCUMENT TYPE
CONSTRUCTION METHOD CB-CNV SABECO
Trang 17SBCNT-AP-BPTC-P3.01
Trang 19CSCS
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
SBCNT-AP-BPTC-P3.03
Trang 20R = 40m
CSCS
CSCS
CSCS
CSCS
Trang 21R = 40m
N
WW
WW
12
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
SBCNT-AP-BPTC-P3.05
Trang 22GK2- L=15m GK1- L=15m
Trang 23AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
Trang 24a, b 400a+b 400
900120015301700
13851250
9001200153017001600
Trang 25a, b 400 a+b 400
Bd
HdHs
h = Hd - Hs
/ U-JACK LENGTH300
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
13851250
9001200153017001600
1700
1960STAIR FRAME DIAGONAL
Trang 26d - Hs BEAM h = Hd - Hs 350 ARRANGE 1 TIE FOR BEAM BOTTOM CLAMPING
a, b 400 a+b 400
Bd
HdHs
h = Hd - Hs
/ U-JACK LENGTH
900120015301700
13851250
9001200153017001600
1700
1960STAIR FRAME DIAGONAL
Trang 27LEVEL N+1A+Ht
a, b 400a+b 400
Hs
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
13851250
9001200153017001600
1700
1960STAIR FRAME DIAGONAL
Trang 28LEVEL N
A+Ht
U-JACK
BASE-JACKSCAFFOLD
a, b 400a+b 400
Hs
900120015301700
13851250
9001200153017001600
1700
1960STAIR FRAME DIAGONAL
Trang 29LEVEL N+1A+Ht
300 < H S 400
U-JACK
BASE-JACKSCAFFOLD
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
a, b 400a+b 400
Hs
900120015301700
13851250
9001200153017001600
1700
1960STAIR FRAME DIAGONAL
Trang 30LEVEL N+1A+Ht
400 < H S 600
U-JACK
BASE-JACKSCAFFOLD
a, b 400a+b 400
Hs
900120015301700
1385
900120015301700
1700
1960FRAME DIAGONAL
Trang 31TY / TIE D16
WORKING PLATFORMSAFETY BARRIER
Bc 1000; Hc 1000
NO USE TIE ROD AT THE MIDDLE OF COLUMN
TY / TIE D16
50x100x1.8 50x50x1.8
DETAIL 2
DETAI 2
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
SBCNT-AP-BPTC-P4.08
Trang 32TY / TIE D16
Trang 33TY / TIE D16
50x50x1.850x50x1.8
LEVEL N
LEVEL N+1
TYPICAL WALL FORMWORK PLAN
SECTION A-A
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
Trang 34INSIDE ANGLE DETAILS
OUTSIDE ANGLE DETAILS
Bv
Lv / WALL LENGTH
bv
Ht
Trang 35WALL FORMWOOD OF LIFT CORE DETAILED PLAN
Ht
50x50x1.8 50x50x1.8
TY / TIE D12
OUTSIDE ANGLE DETAILS
TIE ROD DETAIL
Trang 37AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
AS SHOW 25/12/2014
CONSTRUCTION METHOD
CB-CNV SABECO
SBCNT-AP-BPTC-P4.14
Trang 38AN PHONG
Q.2, TP.HCM DOCUMENT TYPE
CONSTRUCTION METHOD
CB-CNV SABECO
Trang 39AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
AS SHOW 25/12/2014
CONSTRUCTION METHOD
CB-CNV SABECO
SBCNT-AP-BPTC-P4.16
Trang 41Alum surveying rod
Bench mark elevation
Tolerable limit of deviation shall be appliod inaccordance with vietnam construction standard
Contractor states the way of main item locationothers are the same
Center line on the top of column
Marked elevation
MEASURED LENGTH
MEASURED MEASURED
LENGTH
10-20m Beviation of plan position based on the
axes of planning
5 <10m
Theodolite surveying rod and steel measurement 10
15
30-50m 20-30m
20
Auxiliary lines paralled with the buinlding 5
Based on the auxiliary lines that are perpendicular to the building
LEAD ELEVATION CENTER LINE TO COLUMN
Theodolite surveying rod and steel measurement
Theodolite surveying rod and steel
Alum surveying rod
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
SBCNT-AP-BPTC-P4.18
Trang 42AN PHONG
Q.2, TP.HCM DOCUMENT TYPE
CONSTRUCTION METHOD CB-CNV SABECO
Trang 54AN PHONG
Q.2, TP.HCM DOCUMENT TYPE
CONSTRUCTION METHOD CB-CNV SABECO
Trang 55AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
Trang 56AN PHONG
Q.2, TP.HCM DOCUMENT TYPE
CONSTRUCTION METHOD CB-CNV SABECO
Trang 57AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
Trang 58AN PHONG
Q.2, TP.HCM DOCUMENT TYPE
STT - NO.
CONSTRUCTION METHOD CB-CNV SABECO
TOILETS PARKING
EXECUTION FIGURE
MOBILIZATION OF MATERIALS
WASHING BAY
Trang 59AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
P6.05
Trang 60AN PHONG
Q.2, TP.HCM DOCUMENT TYPE
STT - NO.
CONSTRUCTION METHOD CB-CNV SABECO
EXECUTION FIGURE
EXCAVATION WORK EXCAVATION WORK
EXCAVATION WORK
WASHING TRUCK
Trang 61AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
Trang 62EXECUTION FIGURE
WALL FORMWORK
Trang 63AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
BEAM REBAR WORK
P6.09
EXECUTION FIGURE
SLAB SCAFFOLDING WORK
Trang 64AN PHONG
Q.2, TP.HCM DOCUMENT TYPE
STT - NO.
CONSTRUCTION METHOD CB-CNV SABECO
CONCRETE FLOATING WORK
SLAB REBAR WORK
SLAB CONCRETE FINISH
EXECUTION FIGURE
SLAB REBAR WORK
Trang 65AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
Trang 661.V 2 3.NGHI
K
START
SHOW CENTERLINE OF WALL , WALL THICKNESS WALL TYPE DETAILING.
LOCATION OF DOORS, OPENINGS , LINTEL BEAM
BASE LINE MARK LOCATION , WALL THICKNESS ON FLOOR
INSTALL ANCHOR TO COLLUMN, WALL, FLOOR.USE EPOXY 511 DETAIL OF WALL TYPE.
LINTEL BEAM , SUB COLUMN
CLEAN WALL BASE
CHECK LOCATION , WITH WALL AND OPENINGS.
FINISHING CONTRACTOR
BASE ON GRIDLINE
WALL HEAD FILLINGS.
6.BUILD WALL
THIS WORK MUST BE CARRY OUT BEFORE PLASTERING
CUTTING WALL TAKE PLACE AT LEAST 3 DAY AFTER FINISH OF BRICK WALL.
ALLOWED TO USED PRECAST CONCRETE LINTEL OR INSITU CONCRETE LINTEL
WATER SURFACE BEFORE BUILD
DROP PLUMB BOB FROM CONCRETE CEILLING TO BASE COURSE TO DETERMINE VERTICAL LINE OF WALL
VERTICAL BOND COURSES MUST NOT ON THE SAME LINE IN VERTICAL DIRECTION.
ATTENTIONS TO ANCHORING BRICK AT CORNER WALL INSERT A SOLID BRICK LINE EACH 5 HOLLOW BRICK LINE
INSPECTION BETWEEN SUPERVISOR AND CONSULTANCIES.
INSPECTION BETWEEN M&E SUPERVISOR AND CONSULTANCIES
Trang 67LAYER SOLID BRICK DOWN
TYPICAL WALL 110 ELEVATION
SECTION 1-1
LAYER SOLID BRICK DOWN
MORTAR MORTAR
TYPICAL WALL 210 ELEVATION
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
SBCNT-AP-BPTC-P7.02
Trang 69A + KHUNG BAO - TOTAL HEIGHT
C.R A + KHUNG BAOTOTAL WIDE
C.R A + KHUNG BAOTOTAL WIDE
C.R A + KHUNG BAOTOTAL WIDE
SBCNT-AP-BPTC-P7.04
Trang 703 VERIFICATION OF BRICK WALL, DOOR AND WINDOWS, CONCRETE
MEMBER
TCVN 5674-1992: FINISHED WORKS IN CONSTRUCTION.
EXECUTION, CHECK AND ACCEPTANCE.
TCVN 4459-1987: GUIDANCE FOR MIXING AND USING OF BUILDING MORTARS
FINISHING CONTRACTOR, M&E CONTRACTOR, CONSULTANCIES
1.V
1.SHOP-DRAWING
SHOW CENTERLINE OF WALL , WALL THICKNESS WALL TYPE DETAILING.
LOCATION OF DOORS, OPENINGS , LINTEL BEAM
FINISHING CONTRACTOR
BRICK WALL: SMOOTH CONCRETE MEMBER: SMOOTH DOOR AND WINDOW FRAME: DIMENTION, LOCATION
2 PLASTERING THICKNESS
USING LASER TO ASSIGN AND CHECK PLASTERING THICKNESS.
4 ATTACH WIRE MESH
ATTACH WIRE MESH BETWEEN BRICK WALL AND SUB COLUMN ATTACH WIRE MESH BETWEEN BRICK WALL AND CONCRETE WALL ATTACH WIRE MESH BETWEEN BRICK WALL AND LINTEL BEAM, CEILING BEAM ATTACH WIRE MESH AT M&E PIPE, WATER PIPE ON BRICK WALL
5 WALL SURFACE PREPARATION
BRICK WALL MUST BE CLEANED AND WATERED BEFORE PLASTERING
SURFACE OF CONCRETE MEMBER MUST BE MAKE ROUGH BEFORE PLASTERING
FINISHING CONTRACTOR FINISHING CONTRACTOR
ALL WALL SIDE MUST BE STRAIGHT
7 DOOR AND WINDOW FRAME
VERIFICATION OF DOOR AND WINDOW FRAMES WHEN PLASTERING, FILL SLITS WITH SILICON
10 CORRECTION
CHECKING FLAT LEVEL OF PLASTERING PLANE FIX ALL SHRINKAGE-CRACKS
CHECKING ALL OPENINGS, DOORS AND WINDOWS.
FINISH
11 INSPECTION
INTERNAL INSPECTION INSPECTION BETWEEN SUPERVISOR AND CONSULTANCIES.
INSPECTION BETWEEN M&E SUPERVISOR AND CONSULTANCIES
REFERENCE STANDARDS:
K
FINISHING PROCESS WALL PLASTERING
Trang 71M&E FINISHING WORKS
CHECKING DIMENTION OF WALL, CONCRETE STRUCTURAL, DOOR CHECKING MESH BETWEEN CONCRETE MEMBERS AND BRICK WALL
BRICK WALL
BASE LINE
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
SBCNT-AP-BPTC-P7.06
Trang 72RECTAGULAR RULER
CHECKING PLANE SURFACE OFWALL AFTER PLASTERINGBASE LINE
STANDARDPOINT MORTAR
IN-SITU MORTAR GRADE 75, 15mm thk
WATERING WALLPLASTERING WALLPLASTERING WALL AT WINDOW AND DOOR FRAMESEND OF PLASTERING
CLEANINGCURING BY WATERCORRECTION
KI M TRA / CHECKING
LEVEL
STANDARDPOINT MORTAR
Trang 73WALL PLASTERING
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn
SBCNT-AP-BPTC-P7.08
Trang 74BASE LINE TO CHECK LEVEL
STANDARD POINT MORTAR STANDARD POINT MORTAR
SCREED FLOOR
PREPARATION FOR SCREED FLOOR
CLEAN SURFACE OF SLAB POSITION STANDARD LINE HIGHER THAN FINISHED LEVEL 1M INSTALL STANDARD POINT MORTAR DEPEND ON DESIGN THICKNESS
MIXING MOTAR SCREED WITH DESIGN THICKNESS.
CHECKING FINISH LEVEL.
Motar thickness base point Mortar grade 75
Trang 75-be cleaned all dust and grease.
surface absorb water, it must be watered before tiling.
Or mixing by hand when all mix is homogeneous and don't have any lump.
- light and high temperature.
-+ -
- Brush a glue layer on surface, using toothed trowel to spread bond over a size 1-2 sqm.
should be brush on back side of the tile.
glue layer and push on or using plastic hammer knock on tile Notice to space between 2 tiles over 2mm to abrade later.
- Adjustment is accepted in 15mins before the glue is solid.
-sau - Advoid concentrating bond on back side of tiles.
using glue on hot surface and direct sun shine place.
must be clean and dry before abrade.
-
Pour tile glue in to the bucket and slowly stir until the intermixture become consistent Mixing ratio (water - glue) depend on producer guidance.
-Brick edge must be mitre at 45*
Cement mortar Wall
Lining brick
2000
STEPS OF WALL TILING
L p v Primary coat lof plaster with the edge of trowel
1/ Preparation work:
- Plastering with the frowel edge for surface roughness in crease before wall lining
2/ Landmark
- Put a lining brick in aovance as the picture for pilot light
- Distance of brick must be smaller than the length of 3/ Tining
- Carry out the tining from left to right & from top to bottom based on the fix point
- Use mortar with high grade fro connecting the lining brick
to the wall
- Use tight rope for lining
- - - -
-Plank at wall footing for catching the falling mortar
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn STT - NO.
AS SHOW 25/12/2014
CONSTRUCTION METHOD
CB-CNV SABECO
SBCNT-AP-BPTC-P7.10
Trang 76CUT & GROOVE ON THE WALL
BRICK CHISEL AT THE CHANNEL
PIPE BENDING
INSTALLATION
Backfilling with mortar
Hard plastic pipe
Cable laying under ceiling
Lamp
Winding end with special tybe
REEVE & TUG THE WIND Starting with PE d=4mm
Trang 77Finished floor elevation
ELECTRICAL CONSTRUCTION METHOD
- Length of tap, socket plug over 150-200mm is required
- All wires must be covered with hard cladding
- Distance b/w plug & floor is 600mm & 1500mm for switch & finished floor
- Wall wiring is not allowed
- Wire tobe slack slightly
- Power cable laying for devices with high capacity
Wall wiring not allowed
Electric wire Unprotected conductor is notallowed
must have flexible protecting tube
Socket
Finished floor elevation
c m
METHOD FOR SOCKET FITTING
WALL METHOD ELECTRIC CONDUITS
AN PHONG
Q.2, TP.HCM Email: pda@AnPhong.vn Website: www.AnPhong.vn STT - NO.
AS SHOW 25/12/2014
CONSTRUCTION METHOD
CB-CNV SABECO
SBCNT-AP-BPTC-P7.12
Trang 78NH L CH NG I C A NGLOCATE THE HOLE & PIPE LINE
METHOD FOR DUCT WORK
- Must inspect the length & coupling distance of PVC pipe befire construction
- Elbow, reducer to be cleaned bffore construction
- For pipe crossing floor need to put an opening pipe or a section avoid floor breaking forintake port drainage opening laying all holes extended from 2-4mm
- All drainage openings floor holes tobe filled with water proofing sika after completed
- Use angle iron support in case adapter to be too long
BRICK BREAKING
PIPE FITTING TEMPORARY FIX &
FILLING WITH MORTAR TO THE GROOVE BRICK CHISEL
TYPICAL WASH BASIN FITTING TYPICAL LAVATORY BOWL FITTING
Elbow pipe 90 or T-Y pipeDownpipe d90-d110
Flow out exit to the counmon line
CUTTING & GROOVING ON WALL
Filling with mortar
Galvamised steel pipe