TRANSVERSE TRUSSLAUNCHING WAGON PIER SUPPORT FORMWORK TENSION BARS... Overhead MSS - A typical construction cycleAfter concreting, curing and tensioning of cables, the Main Girder and th
Trang 1MOVABLE SCAFFOLDING SYSTEM
MSS - Moving Scaffolding System
Usual Total Length 500m – several km’s Usual cycle time / span 6 – 10 days
Trang 2Our strong technical support team can offer services at various levels:
The Movable Scaffolding System - MSS:
Complete or partial delivery
• design, know-how & construction engineering
Consultancy & supervision
• experienced supervision and consultation during fabrication,
assembly & operation
• design, know-how & construction engineering
• Feasibility studies
Trang 3MSS - Moving Scaffolding System
The MSS was first designed in close co-operation with Norwegian contractors in the 1970's
The system has since then been developed and successfully used in various major bridge projects in Scandinavia and world wide.
The design of our advanced equipment has been improved and optimized over the years, based on our wealth of experience from over 100 projects The system is light weight, easy to assemble, practical in design,
supported by internationally known hydraulic and cranage systems, and most importantly, efficient in operation
Strukturas supplies two types of MSS:
• Overhead MSS
• Underslung MSS
Trang 4Overhead MSS
Trang 5The development of our cost-effective system over the years, stems from the need to reduce the high costs of construction manpower in Norway Today, our MSS for cast-in-situ bridges can offer many cost-saving advantages to your bridge construction projects, through:
Overhead MSS for the construction of
Cast in-Situ Bridges
Trang 6Overhead MSS
The MSS can also easily be adapted to any bridge cross section (single box, double box, double T, etc.) and span configuration This flexibility provides the contractor the opportunity to re-use the equipment from one project to another
Trang 7TRANSVERSE TRUSS
LAUNCHING WAGON
PIER SUPPORT
FORMWORK TENSION BARS
Trang 8Overhead MSS - A typical construction cycle
After concreting, curing and tensioning of
cables, the Main Girder and the Transverse
Trusses are lowered by the main jacks at
the rear and front Pier Supports
Trang 9After concreting, curing and tensioning of
cables, the Main Girder and the Transverse
Trusses are lowered by the main jacks at
the rear and front Pier Supports
The Main Girder is now resting on the
launching wagon The Formwork is
disconnected from the Tension Bars
Overhead MSS - A typical construction cycle
Trang 10After concreting, curing and tensioning of
cables, the Main Girder and the Transverse
Trusses are lowered by the main jacks at
the rear and front Pier Supports
The Main Girder is now resting on the
launching wagon The Formwork is
disconnected from the Tension Bars
The Formwork is now lowered and the
MSS is in the launching position
Overhead MSS - A typical construction cycle
Trang 11After concreting, curing and tensioning of
cables, the Main Girder and the Transverse
Trusses are lowered by the main jacks at
the rear and front Pier Supports
The Main Girder is now resting on the
launching wagon The Formwork is
disconnected from the Tension Bars
The Formwork is now lowered and the
MSS is in the launching position
Overhead MSS - A typical construction cycle
Trang 12After concreting, curing and tensioning of
cables, the Main Girder and the Transverse
Trusses are lowered by the main jacks at
the rear and front Pier Supports
The Main Girder is now resting on the
launching wagon The Formwork is
disconnected from the Tension Bars
The Formwork is now lowered and the
MSS is in the launching position
Overhead MSS - A typical construction cycle
Trang 13The MSS is ready for launching The
launching operation to the next concreting
position is to be carried out
NOTE
The first span is usually 0,8 x max span The following
pours will cantilever by 1/5 of the span lengths.
Overhead MSS - A typical construction cycle
Trang 14The MSS is ready for launching The
launching operation to the next concreting
position is to be carried out
Overhead MSS - A typical construction cycle
Trang 15Overhead MSS - A typical construction cycle
Trang 16and the MSS is now ready to be raised into
the concreting position
In the next position, the Formwork is
assembled and rigged into place
A Rear Support is rigged in place, and will
provide the lifting of the Main Girder by
means of the two rear hydraulic main jacks
The Suspension Bars are adjusted,
However, no Pier Support will be available
at the rear end of the Main Girder this time
Overhead MSS - A typical construction cycle
Trang 18The MSS is now ready to be lifted into the
concreting position
Overhead MSS - A typical construction cycle
Trang 19Overhead MSS - Rio Major, Portugal
Trang 20Overhead MSS - Rio Major, Portugal
Trang 21Overhead MSS - Grandola, Portugal
Trang 22Overhead MSS – Bid 374, Taiwan, R.O.C.
Trang 23Overhead MSS – Bid 374, Taiwan, R.O.C.