Untitled Đ I H C UEHẠ Ọ TR NG KINH DOANHƯỜ KHOA KINH DOANH QUỐỐC TẾỐ MARKETING TIỂU LUẬN KẾT THÚC HỌC PHẦN MÔ HÌNH KINH DOANH VÀ KHOA HỌC ỨNG DỤNG Giảng viên Hà Quang An Mã lớp học phần 22C1BUS5031830[.]
Trang 1Đ I H C UEH Ạ Ọ
KHOA KINH DOANH QUỐỐC TẾỐ - MARKETING
TIỂU LUẬN KẾT THÚC HỌC PHẦN
MÔ HÌNH KINH DOANH VÀ KHOA HỌC ỨNG DỤNG
Trang 2TABLE OF CONTENTS
CHAPTER 1: LINEAR PROGRAMMING 3
1 Set up an algebraic model - which clearly states the Solution, Problem Objective, and Constraints 3
2 Solve 3
4 Conclusion 4
5 Sensitivity analysis 5
6 So under what conditions should DuoCera produce ONLY SMALL Brick? 5
7 Has DuoCera's production plan changed? 7
CHAPTER 2: DECISION MAKING 9
1 In the initial case, which brick kiln should DuoCera use, and why? 9
2 Should DuoCera take a survey if it's free? And if there is a fee, from how much does it cost DuoCera won't accept surveys? 10
CHAPTER 3: NETWORK DISTRIBUTION 11
TEACHER’S COMMENT:
Trang 3
CHAPTER 1: LINEAR PROGRAMMING
1 Set up an algebraic model - which clearly states the Solution, Problem Objective, and Constraints.
Root
- LT: The number of batches of large type – 1 color
- ST: The number of batches of small type – multicolor
LT = ?; ST = ?
Max (4700000L + 5900000S) = ?
- Cutting time: 0,3L+0,25S <= 60
- Firing time: 0,27L+0,58S <= 105
- Glazing time: 0,16L+0,2S <= 40
- Material: 32,8L+20S <= 6000
- L,S >= 0
2 Solve
Trang 44 Conclusion.
Following the solved result, this company should produce 56,7 batches of large brick (5670 bricks) and 154.64 batches of small brick ( 15460 bricks) to achieve maximum profit is
1,178,865,979 VND and fit the plan they want.
Trang 55 Sensitivity analysis
Shadow price:
Cutting time: Shadow price = 0
Material: Shadow price = 0
Firing: Shadow price = 103,092.7835
Allowable range of Shadow price [ 96.6 ; 116 ]
Glazing: Shadow price = 29,201,030.93
Allowable range of Shadow price [ 36.207 ; 41.577 ] Sensitivity:
1953448.28 ≤ Quantity large type need to produce ≤ 4720000
25000 ≤ Quantity small type need to produce ≤ 10096296.3
4.32989691 ≤ cutting hours used ≤ positive infinity
8.4 ≤ firing hours used ≤ 116
3.79310364 ≤ glazing hours used ≤ 41.57746497
1047.42268≤ material used ≤ positive infinity
Trang 66 DuoCera sees small bricks selling well and doing well so they are trying to produce only small bricks So under what conditions should DuoCera produce ONLY SMALL Brick?
According to Sensitivity Report 1.6, only Glazing time has shadow price different from 0
So we change Right hand sight (Glazing time) to change Total profit
Trang 7Conclusion: Allowable increase hours (Firing time) is: [ 10.889; 11 ]
Firing time = [115.889; 116] so DuoCera should produce small bricks only
7 Because of some technical issues, the brick kiln had to be cut down by 3 hours/week – that is, only 37 hours a week instead of 40 hours like the original So has DuoCera's production plan changed?
Trang 8Conclusion: If the hours for work are cutted down by 3 hours per week, DuoCera’s production
will be changed
Trang 9CHAPTER 2: DECISION MAKING
1 In the initial case, which brick kiln should DuoCera use, and why?
Conclusion: Producing in Vinh Long ceramic is the best choice Because it brings maximum
profit
Trang 102 Should DuoCera take a survey if it's free? And if there is a fee, from how much does
it cost DuoCera won't accept surveys?
Case 1: Free survey
Conclusion: DuoCera company should do free survey.
Case 2: Paid survey
Profit difference between doing survey and not doing survey is:
X = 16,058,590,000 - 16,056,000,000 = 2,590,000 VND
Trang 11Conclusion: If the fee for survey more than 2,590,000, they shouldn’t do survey If the fee less
than 2,590,000, they should do survey
Trang 12CHAPTER 3: NETWORK DISTRIBUTION
DuoCera needs to transport goods to Ninh Thuan via the following routes, determine the appropriate route:
Conclusion: DuoCera should chose the route: Dong Nai – B – E – F – H – J – Ninh Thuan.