8.6 million data centres globally
60,000 in EU
-66% in UK, Germany, France & Netherlands
Trang 5DC growth – 300% in EU by 2025 / 500% global 2030
Trang 6Greatest impact - operational energy - emphasis on 24/7 operation and performance
Trang 7Embodied impact - building life 60 years
15% of embodied environmental impact derives from building and facilities
85% derives from IT equipment
e.g 20 million servers etc =
0.56 million tonnes materials
DC equipment - replaced 1–5 years
Trang 8Recycling reclamation & reuse
Official figures
~35% WEEE recycling in EU
~ 17% globally Actual figures – unknown
Remanufacture, reclamation & reuse?
End-of-Life
DCI growth much quicker than
reprocessing methods & infrastructure
Trang 9Critical Raw Materials
British Geological Survey
Risk List 2015 –
elements of economic value
Green – low risk
Red – high risk
DC industry
CRM - EU
Dy, Nd, Pr, Tb Sb
Co
Mg Pd Be
Si CRM - 0.2% by mass
Trang 11uses whole-life thinking and brings together representatives from all DCI sub-sectors to share knowledge and accelerate development of a sectoral Circular Economy
reduce waste and prevent supply chain problems to secure uninterrupted DC operation and service in the future
increase resource efficiency / reclamation & reuse of CRM in NWE
Trang 14In first year CEDaCI has:
Completed comprehensive situational analysis
Started building Network of representatives
from all DCI sub-sectors
Set up national expert Working Groups
Launched Pilots in UK, NL and FR
Held Co-creation workshops – WI
Disseminated information e.g website, in print,
Trang 15Output / outcomes
Sectoral Situational Analysis
Knowledge transfer - Working Groups
Co-creation Workshops – national / international
Bespoke sectoral LCA / S-LCA / LCC
Eco-design guidelines for Circular Economy
Business models
Decision Making Tool
Training for 50+ SMEs – DMT
Trang 16Output / outcomes
Pilots – increase Circularity
end of project – 80 servers reprocessed / 8 types /~4kg CRM reclaimed;
sectoral growth ongoing / material use / product decreases after 5 years - reuse rates increase to 65% / 35% becomes
‘waste’; all 10 CRM are recycled and 19% (201 t) is recycled after 10 years - 75% CRM reused in DCI / only 25% becomes