1. Trang chủ
  2. » Ngoại Ngữ

SPS16484 Stayton - Scio Rd Oakville Rd Paving (Linn Co ) w addenda 08-31-09

152 5 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Tiêu đề Stayton - Scio Rd & Oakville Rd Paving (Linn County)
Trường học Oregon Department of Transportation
Chuyên ngành Highway Construction
Thể loại bid booklet
Năm xuất bản 2009
Thành phố Salem
Định dạng
Số trang 152
Dung lượng 1,06 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

Section 1: On-the-Job Training Policy Statement The Contractor shall take all necessary and reasonable steps to ensure that minorities andwomen have the opportunity to compete for and pa

Trang 1

BID BOOKLET FOR HIGHWAY CONSTRUCTION

OREGON DEPARTMENT OF TRANSPORTATION

SALEM, OREGON

GRADING AND PAVING STAYTON - SCIO RD & OAKVILLE RD PAVING (LINN COUNTY)

SECTION VARIOUS HIGHWAYS LINN COUNTY AUGUSTSEPTEMBER 2178, 2009

CLASS OF PROJECT FEDERAL AID NUMBER OR "STATE" X-STP-C043(022) CLASS OF WORK FROM CLASS OF WORK SHEET ASPHALT CONCRETE PAVING AND OILING BID OF

Trang 4

TIME AND PLACE OF RECEIVING BIDS

Bids for the work described above will be opened and read at the Oregon Department ofTransportation, 455 Airport Road SE, Building E, Salem, Oregon, at 9:00 a.m on the27th18th day of AugustSeptember, 2009

Prior to 8:00 a.m on the above date, submit Bids to:

ODOT Procurement Office, Procurement Manager

455 Airport Road SE, Building K

Salem, Oregon 97301-5348

Between 8:00 a.m and 9:00 a.m on the above date, submit Bids to Building K at the aboveaddress or to:

Oregon Department of Transportation

455 Airport Road SE, Building E

Salem, Oregon

COMPLETION TIME LIMIT

(Use one of the following four completion time options, as appropriate Fill in the blanks.)

(Option 1 When on-site work is to be controlled, use the following.)

Complete all Work to be done under the Contract before the elapse of _ Calendar Days,

or not later than , whichever occurs first

Recording of the elapse of Calendar Days will begin on the day the Contractor beginsOn-Site Work as defined in 00110.20

(Option 2 When seeding establishment or plant establishment is required, use the following Delete what does not apply Remove parentheses.)

Complete all Work to be done under the Contract, except for (seeding establishment) (and)plant establishment, not later than

(Option 3 When there are two completion times, use the following Delete what does not apply Remove parentheses in the second paragraph as needed.)

Trang 5

There are two Contract Times on this Project as follows:

(1) Complete all Work to be done under the Contract, except for ,not later than

(2) Complete all Work to be done under the Contract (, except for (seedingestablishment) (and) plant establishment, ) not later than

(Option 4 When none of the three options above apply, use the following.)

Complete all Work to be done under the Contract not later than November 7,2009 _

The Class of Work for this Project is: Asphalt Concrete Paving andOiling _

The Class of Work for this Project is the combination of 1) &2)

The Class of Work for this Project is either: A) , orB) _

The Class of Work for this Project is either: A) , or B) thecombination of 1) & 2) _

(Use this list to fill in the blanks above Delete this list when finished.)

Earthwork and Drainage

Bridges and Structures

Painting

Rock Production

Aggregate Bases

Asphalt Concrete Paving and Oiling

Portland Cement Concrete Paving

Pavement Markings

Signing

Trang 6

Landscaping

Miscellaneous Highway AppurtenancesBuildings

Trang 7

APPLICABLE SPECIAL PROVISIONS

The Special Provisions booklet applicable to the above-described work, for which Bids will

be opened at the time and place stated above, is that which contains the exact information

as shown above on this page

Bidders are cautioned against basing their Bids on a booklet bearing any differentdescription, date(s), class of project, or class of work

Trang 8

SPECIAL PROVISIONS FOR HIGHWAY CONSTRUCTION

OREGON DEPARTMENT OF TRANSPORTATION

SALEM, OREGON

GRADING AND PAVING STAYTON - SCIO RD & OAKVILLE RD PAVING (LINN

COUNTY)SECTION VARIOUS HIGHWAYS LINN COUNTY AUGUSTSEPTEMBER 2718, 2009

If a prebid meeting is required, place prebid information here Otherwise delete this field.

This Project Includes 2009 American Recovery & Reinvestment Act (ARRA) Stimulus Funding

Trang 11

TIME AND PLACE OF RECEIVING BIDS

Bids for the work described above will be opened and read at the Oregon Department ofTransportation, 455 Airport Road SE, Bldg E, Salem, Oregon 97301-5348, at 9:00 a.m onthe 27th18th day of AugustSeptember, 2009

COMPLETION TIME LIMIT

(Use one of the following four completion time options, as appropriate Fill in the blanks.)

(Option 1 When on-site work is to be controlled, use the following.)

Complete all Work to be done under the Contract before the elapse of _ Calendar Days,

or not later than , whichever occurs first

Recording of the elapse of Calendar Days will begin on the day the Contractor beginsOn-Site Work as defined in 00110.20

(Option 2 When seeding establishment or plant establishment is required, use the following Delete what does not apply Remove parentheses.)

Complete all Work to be done under the Contract, except for (seeding establishment) (and)plant establishment, not later than

(Option 3 When there are two completion times, use the following Delete what does not apply Remove parentheses in the second paragraph as needed.)

There are two Contract Times on this Project as follows:

(1) Complete all Work to be done under the Contract, except for ,not later than

(2) Complete all Work to be done under the Contract (, except for (seedingestablishment) (and) plant establishment, ) not later than

(Option 4 When none of the three options above apply, use the following.)

Trang 12

Complete all Work to be done under the Contract not later than November 7, 2009.

Complete all Work to be done under the Contract not later than

The Class of Work for this Project is: Asphalt Concrete Paving andOiling _

The Class of Work for this Project is the combination of 1) _ &2)

The Class of Work for this Project is either: A) , orB)

The Class of Work for this Project is either: A) _, or B) thecombination of 1) _ & 2) _

(Use this list to fill in the blanks above Delete this list when finished.)

Earthwork and Drainage

Bridges and Structures

Painting

Rock Production

Aggregate Bases

Asphalt Concrete Paving and Oiling

Portland Cement Concrete Paving

Trang 13

Information pertaining to this Project may be obtained from the following:

Dave Davies, Project Manager, David Evans and Associates, Inc., 530 Center St NE, Suite

605, Salem: Phone (503) 480-1320, FAX (503) 361-8655

Michael Starnes, ODOT Local Agency Program Liaison, 455 Airport Rd SE, Bldg B, Salem97301; Phone (503) 986-6920

Trang 15

Stayton - Scio Rd & Oakville Rd Paving (Linn County)

Grading and Paving

SP TOC FED (06-11-09)

(Follow all instructions If there are no instructions then include the line on all projects Delete what does not apply Remove all instructions before preparing the final document.)

TABLE OF CONTENTS FOR SPECIAL PROVISIONS

AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) FUNDING PROVISIONS

(Use only when ARRA Stimulus Funding is used on the project.)

REQUIRED CONTRACT PROVISIONS FOR FEDERAL-AID CONTRACTS (FHWA-1273) ON-SITE WORKFORCE AFFIRMATIVE ACTION REQUIREMENTS FOR WOMEN AND MINORITIES ON FEDERAL-AID CONTRACTS

EQUAL EMPLOYMENT OPPORTUNITY PROVISIONS

EQUAL EMPLOYMENT OPPORTUNITY-ASPIRATIONAL TARGET PROVISIONS (Use

only when aspirational diversity target provisions are required Obtain information from the Office of Civil Rights.)

DBE AND MWESB PROVISIONS

ASSIGNED CONTRACT GOAL AND TARGET

ON-THE-JOB TRAINING (Use when there is only on-the-job training Obtain

information from the Office of Civil Rights.)

REIMBURSABLE FEDERAL ON-THE-JOB AND APPRENTICESHIP TRAINING (Use only

when reimbursable OJT and apprenticeship training is required Obtain information from the Office of Civil Rights.)

INDIAN EMPLOYMENT PREFERENCE GOAL AND COMPLIANCE FEE (Use with Indian

Preference in Employment on Federal-Aid Projects.)

RAILROAD CONTRACTOR REQUIREMENTS (Use only with railroad involvement.)

PROJECT WAGE RATES

WEB SITE ADDRESSES

WORK TO BE DONE .1

SECTION 00110 - ORGANIZATION, CONVENTIONS, ABBREVIATIONS AND DEFINITIONS .2

SECTION 00120 - BIDDING REQUIREMENTS AND PROCEDURES .2

SECTION 00130 - AWARD AND EXECUTION OF CONTRACT .2

SECTION 00140 - SCOPE OF WORK .2

SECTION 00150 - CONTROL OF WORK .3

SECTION 00160 - SOURCE OF MATERIALS .4

SECTION 00165 - QUALITY OF MATERIALS .4

SECTION 00170 - LEGAL RELATIONS AND RESPONSIBILITIES .4

SECTION 00180 - PROSECUTION AND PROGRESS .6

SECTION 00190 - MEASUREMENT OF PAY QUANTITIES .8

SECTION 00195 - PAYMENT .8

SECTION 00196 - PAYMENT FOR EXTRA WORK .11

SECTION 00197 - PAYMENT FOR FORCE ACCOUNT WORK .11

SECTION 00199 - DISAGREEMENTS, PROTESTS, AND CLAIMS .11

SECTION 00210 - MOBILIZATION .12

SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC .12

SECTION 00225 - WORK ZONE TRAFFIC CONTROL .13

SECTION 00280 - EROSION AND SEDIMENT CONTROL .15

SECTION 00290 - ENVIRONMENTAL PROTECTION .15

SECTION 00350 - GEOSYNTHETIC INSTALLATION .17

i

Trang 16

Stayton - Scio Rd & Oakville Rd Paving (Linn County)

Grading and Paving

SECTION 00440 - COMMERCIAL GRADE CONCRETE .19

SECTION 00442 - CONTROLLED LOW STRENGTH MATERIALS .19

SECTION 00490 - WORK ON EXISTING SEWERS AND STRUCTURES .19

SECTION 00503 - BRIDGE DECK COLD PLANE PAVEMENT REMOVAL .20

SECTION 00620 - COLD PLANE PAVEMENT REMOVAL .21

SECTION 00640 - AGGREGATE BASE AND SHOULDERS .21

SECTION 00730 - EMULSIFIED ASPHALT TACK COAT .22

SECTION 00745 - HOT MIXED ASPHALT CONCRETE (HMAC) .22

SECTION 00749 - MISCELLANEOUS ASPHALT CONCRETE STRUCTURES .30

SECTION 00850 - COMMON PROVISIONS FOR PAVEMENT MARKINGS .31

SECTION 00860 - LONGITUDINAL PAVEMENT MARKINGS - PAINT .31

SECTION 00867 - TRANSVERSE PAVEMENT MARKINGS - LEGENDS AND BARS .32

SECTION 02110 - POSTS, BLOCKS, AND BRACES .33

SECTION 02320 - GEOSYNTHETICS .33

COATING SYSTEM WARRANTY AND PERFORMANCE BOND (Use only on maintenance coating projects.) WORK TO BE DONE .1

SECTION 00110 - ORGANIZATION, CONVENTIONS, ABBREVIATIONS AND DEFINITIONS .2

SECTION 00120 - BIDDING REQUIREMENTS AND PROCEDURES .2

SECTION 00130 - AWARD AND EXECUTION OF CONTRACT .3

SECTION 00140 - SCOPE OF WORK .4

SECTION 00150 - CONTROL OF WORK .4

SECTION 00160 - SOURCE OF MATERIALS .7

SECTION 00165 - QUALITY OF MATERIALS .8

SECTION 00170 - LEGAL RELATIONS AND RESPONSIBILITIES .8

SECTION 00180 - PROSECUTION AND PROGRESS .13

SECTION 00190 - MEASUREMENT OF PAY QUANTITIES .19

SECTION 00195 - PAYMENT .20

SECTION 00196 - PAYMENT FOR EXTRA WORK .25

SECTION 00197 - PAYMENT FOR FORCE ACCOUNT WORK .25

SECTION 00199 - DISAGREEMENTS, PROTESTS, AND CLAIMS .25

SECTION 00210 - MOBILIZATION .26

SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC .26

SECTION 00225 - WORK ZONE TRAFFIC CONTROL .29

SECTION 00280 - EROSION AND SEDIMENT CONTROL .36

SECTION 00290 - ENVIRONMENTAL PROTECTION .38

SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS .55

SECTION 00320 - CLEARING AND GRUBBING .55

SECTION 00440 - COMMERCIAL GRADE CONCRETE .57

SECTION 00503 - BRIDGE DECK COLD PLANE PAVEMENT REMOVAL .58

SECTION 00620 - COLD PLANE PAVEMENT REMOVAL .60

SECTION 00640 - AGGREGATE BASE AND SHOULDERS .60

SECTION 00730 - EMULSIFIED ASPHALT TACK COAT .61

SECTION 00745 - HOT MIXED ASPHALT CONCRETE (HMAC) .61

SECTION 00749 - MISCELLANEOUS ASPHALT CONCRETE STRUCTURES .75

SECTION 00810 - METAL GUARDRAIL .77

ii

Trang 17

Stayton - Scio Rd & Oakville Rd Paving (Linn County)

Grading and Paving

SECTION 00850 - COMMON PROVISIONS FOR PAVEMENT MARKINGS .77SECTION 00860 - LONGITUDINAL PAVEMENT MARKINGS - PAINT .79SECTION 00867 - TRANSVERSE PAVEMENT MARKINGS - LEGENDS AND

BARS .79SECTION 01030 - SEEDING .81SECTION 02110 - POSTS, BLOCKS, AND BRACES .85PLANS (Use only when plans are included in the Special Provisions.)

BID SCHEDULE

iii

Trang 19

Stayton - Scio Rd & Oakville Rd Paving (Linn County)

Grading and Paving

SP DBE (06-04-09)

ASSIGNED DBE CONTRACT GOAL

FOR AFDBE AND ASDBE

The assigned minimum DBE (AFDBE/ASDBE) goal for this Project is 1_ %.

(This goal is only a part of the overall Statewide DBE program.)

A DBE Directory is available from the Office of Minority, Women and Emerging SmallBusiness (OMWESB) web site at http://www4.cbs.state.or.us/ex/dir/omwesb/ or bytelephone at (503) 947-7924

Trang 20

Stayton - Scio Rd & Oakville Rd Paving Grading and Paving

Trang 21

Stayton - Scio Rd & Oakville Rd Paving (Linn County)

Paving

Stayton - Scio Rd & Oakville Rd Paving

Grading and Paving

ASSIGNED MWESB ASPIRATIONAL TARGETS

The assigned MWESB aspirational target for this Project is 3 _ %

An MWESB Directory is available from the Office of Minority, Women and Emerging SmallBusiness (OMWESB) web site at http://www4.cbs.state.or.us/ex/dir/omwesb/ or bytelephone at (503) 947-7924

Trang 23

Stayton - Scio Rd & Oakville Rd Paving

Grading and Paving

SP OJT FED (03-31-08)

(Use this OJT provision when required by the Office of Civil Rights When this provision is used, be sure to include an OJT bid item.)

FEDERAL ON-THE-JOB TRAINING SPECIAL PROVISIONS

This On-the-Job Training (OJT) special provision supersedes subparagraph 7e of the

"On-Site Workforce Affirmative Action Requirements for Women and Minorities onFederal-Aid Contracts" and is in implementation of 23 U.S.C 140(a) All other provisionsapply

Section 1: On-the-Job Training Policy Statement

The Contractor shall take all necessary and reasonable steps to ensure that minorities andwomen have the opportunity to compete for and participate as trainees or apprentices and

to develop as journey-level workers in the type of trade or job classification employed.Contractors may use either a Bureau of Labor and Industries (BOLI) apprenticeship ortraining program, or develop their own on-the-job training program approved by OregonDepartment of Transportation (ODOT) and Federal Highway Administration (FHWA) tosatisfy this OJT requirement

Section 2: Affirmative Action Requirement

Training and upgrading minorities and women in highway construction trades is the primarygoal of these special provisions This shall be accomplished by making systematic anddirect recruitment efforts through public and private sources that are likely to yield minoritiesand women available for training on the work under this contract

When filling these training positions, Contractors and subcontractors are encouraged to hirewomen and minorities who have previously been approved to participate in the On-the-JobTraining Program and have not yet completed their training, or who are currently registered

in a BOLI-approved apprenticeship or training program

Whenever minorities or women are not placed in training positions specified in thesespecial provisions, the Contractor shall provide documented evidence of its affirmativeaction recruitment efforts ODOT will review the Contractor’s recruitment efforts todetermine whether the Contractor has satisfied the Good Faith criteria specified in the

"On Site Workforce Affirmative Action Requirements for Women and Minorities onFederal-Aid Contracts"

Neither the provisions of any collective bargaining agreement, nor the failure by a unionwith whom the Contractor has a collective bargaining agreement, nor any agreement theContractor has with a joint apprenticeship and training committee, shall excuse theContractor’s obligations under these special provisions

This training commitment is not intended, and shall not be used, to discriminate against anyapplicant for training, whether members of a minority group or not

Trang 24

Stayton - Scio Rd & Oakville Rd Paving

Grading and Paving

Whenever trainees or apprentices are terminated, the Contractor shall provide documentedevidence to the Project Manager that shows cause for the termination or voluntaryseparation

Section 3: Assigned On-the-Job Training Positions

(Enter the number of OJT positions in the blank Obtain the number from ODOT Office of Civil Rights.)

The number of on-the-job training positions required under these special provisions is .The ratio of apprentices to journey level workers shall be in accordance with the acceptedstandards for the particular craft or occupation For OJT programs developed by theContractor, the ratio of trainees to journey level workers shall be spelled out in the trainingprogram and are subject to approval by ODOT and FHWA

Whenever a portion of the contract work is subcontracted, the Contractor shall determinehow many, if any, of the trainees or apprentices are to be trained by the subcontractor TheContractor, however, shall retain the responsibility for meeting the training requirements ofthese special provisions and shall also ensure that these provisions apply to eachsubcontract to which training positions are assigned

A Contractor’s request to substitute an on-the-job training position from one craft to anothercraft must be approved by ODOT’s Office of Civil Rights

Section 4: Training Requirements

The intent of these provisions is to provide real and meaningful training in the constructioncrafts rather than clerical or secretarial positions Training in classifications such as flagger,bookkeeper, clerk/typist or secretary is not permissible Training is permissible in lowerlevel management positions such as office engineers, estimators, etc., where the training isoriented toward construction applications and is approved by the Federal HighwayAdministration Off-site training is permissible only when it is an integral part of anapproved training program, meets the criteria under Section 8, paragraph 4 of these specialprovisions, and does not comprise a significant part of the overall training

The Contractor must have and maintain at all times sufficient equipment and fully trainedjourney level workers to train apprentices or trainees in the work processes and comply withthese special provisions A valid certification by an appropriate apprenticeship committeethat the Contractor is an approved training agent shall be prima facie proof of compliancewith this requirement

Section 5: Training/Apprenticeship Programs

Training under these provisions shall be conducted in accordance with a training programsubmitted by the Contractor and approved by ODOT's Office of Civil Rights and the FederalHighway Administration (FHWA) OJT programs for which the Contractor has obtainedapproval of BOLI’s Oregon State Apprenticeship and Training Council shall be acceptedunder these provisions

Training Programs (ODOT Form 731-0335) shall be submitted at the pre-constructionconference ODOT will track training activities provided by the Contractor to trainees

Trang 25

Stayton - Scio Rd & Oakville Rd Paving

Grading and Paving

working under an approved training program The Contractor shall provide ODOT withmonthly progress reports for all trainees working under an approved training program.Trainees shall be paid at least 60% of the appropriate minimum journey level rate specified

in the contract for the first half of the training period, 75% for the third quarter of the trainingperiod, and 90% for the last quarter of the training period If apprentices are enrolled inBOLI-registered program, the appropriate rates approved by the Department of Labor or inconnection with the apprenticeship program shall apply to all trainees being trained for thesame classification who are covered by this special provision

Each individual Training Program must be approved by ODOT’s Office of Civil Rights prior

to commencing work in the craft in which the trainee will be trained The Contractor orsubcontractor who is training an individual not enrolled in an apprenticeship program must

be able to certify in some manner that the trainee has completed an on-the-job trainingprogram This certification will be provided to the trainee and a copy to ODOT’s Office ofCivil Rights upon completion of the training program

 By the 10th of each month, an Apprentice/Trainee Monthly Progress Record (Form731-0332) for each person participating in the On-the-Job Training Program,completed and signed by the trainee The Monthly Progress Record that aContractor or subcontractor routinely sends to an apprenticeship program may beused in lieu of the ODOT Apprentice/Trainee Monthly Progress Record

 By the 10th of each month, an Employment Utilization Report (Form 731-0394).This report reflects work hours by craft, race and gender This report is required ofall Contractors and subcontractors on contracts valued $10,000 and above,regardless of their participation in the OJT Program

 Upon completion of the contract, document to trainee and ODOT the amount andtype of training completed

All required forms will be sent to the Contractor and ODOT Project Manager by the Office ofCivil Rights at the time of contract award Additional forms may be obtained from the Office

of Civil Rights by calling (503) 986-4350

Trang 26

Stayton - Scio Rd & Oakville Rd Paving

Grading and Paving

Section 7: Monitoring and Compliance

ODOT will monitor the Contractor’s actions for compliance with these special provisions.Actions, which will be monitored, include:

 Employment of trainees as required for this contract

 Demonstration of Good Faith Efforts when contractually required training provisionsare not filled with affirmative action candidates

 Maintenance of the records and submission of the reports required by theseprovisions

If the Contractor does not comply with these special provisions, ODOT may withholdprogress payments until compliance with the above is achieved, or impose other lawfulremedies, including holding the Contractor in breach Two breaches of contract exposesthe Contractor to revocation of ODOT’s prequalification status and/or disqualification fromall State of Oregon public contracting opportunities

If subcontractors participate in the OJT Program, the Contractor will be responsible for thesubcontractor’s compliance with the requirements of these special provisions in accordancewith Section 00180.10 of the Supplemental Specifications

Section 8: Measurement and Payment

The pay quantity for On-the-Job Training will be measured by the actual number of hours oftraining provided, measured to the nearest one-half hour

Except as otherwise noted below, the Contractor will be paid training provided to anemployee approved by ODOT and trained in accordance with an approved trainingprogram The Contractor must obtain approval from ODOT to overrun OJT bid item hoursbeyond the quantity shown in the bid schedule in order to be eligible for reimbursement.Payment may be made for training persons in excess of the number specified in Section 3,provided the following has been approved by ODOT prior to the date that excess trainingcommences

 The number, names, gender and race of additional trainees

 The craft(s) in which training is to be provided

 A training program for each trainee

 If not minority or female, documentation of good faith efforts to recruit minorities andwomen in proposed positions

Payment for training under these provisions will be made even though the Contractorreceives additional training program funds from other sources, provided such other sources

do not specifically prohibit the Contractor from receiving other reimbursement.Reimbursement for off-site training will only be made where the Contractor does one ormore of the following and the trainees/apprentices are concurrently employed in a Federal-aid project:

 Contributes to the cost of the training

 Provides the instruction to the trainee/apprentice

 Pays the trainee’s/apprentice’s wage during the off-site training period

Trang 27

Stayton - Scio Rd & Oakville Rd Paving

Grading and Paving

Payments made to the Contractor may be recalled if either the failure to provide therequired training, or the failure to hire the trainee/apprentice upon completion of thecontractor’s OJT program is caused by the Contractor’s lack of Good Faith Efforts inmeeting the requirements of the special provisions Such lack of Good Faith Efforts shallconstitute non-compliance and may lead to Breach of Contract

The item "On-the-Job Training" will be paid in full for training provided and properlydocumented, in conformance with these provisions

No payment for training will be made until the Contractor has submitted all requireddocumentation and approved by ODOT

The item "On-the-Job Training" is intended to cover the Contractor’s additional costsassociated with administering the On-the-Job Training provisions of this contract The On-the-Job Training bid item is not intended to reimburse the Contractor for actual costs nor forthe hourly wage or fringe benefits of the trainee

********

June 2006

Trang 29

(The preparer of these special provisions signs and dates the acknowledgement

of compliance below The preparer may or may not hold a PE stamp If the preparer does hold a PE stamp and also takes responsibility for all or part of the various Sections, the preparer will also apply the PE stamp and sign under the

"PROFESSIONAL OF RECORD CERTIFICATION(S)" and also sign the acknowledgement of compliance on the following page(es).)

CONSOLIDATED SPECIAL PROVISIONS

As the preparer of the consolidated specifications for this Project I acknowledge compliance

with the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT

Highway Construction Contracts" dated July 11, 2008.

By: _ Date: _

David Stitz

David Evans and Associates, Inc

Signature Sheet 1

Trang 31

OREGON DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISIONS

FOR

PavingStayton - Scio Rd & Oakville Rd Paving (Linn County)

Various HighwaysLinn CountyGrading and PavingStayton - Scio Rd & Oakville Rd Paving Section

Various HighwaysLinn County

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Sections 00220, 00225, 00280, 00290, 00350,

00440, 00442, 00490, 00503, 00620, 00640, 00730,

00745, 00749, 00850, 00860 and 00867 (fill in section number(s) here) _

Signature

I also acknowledge compliance with Part 2(b) and Part 2(e) of

the "Modified Exemption from DOJ Legal Sufficiency Review

and Approval for ODOT Highway Construction Contracts" dated

July 11, 2008.

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Section (fill in section number(s) here) _

Signature Sheet 2Signature Sheet 2

Trang 32

I also acknowledge compliance with Part 2(b) and Part 2(e) of

the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated

July 11, 2008.

Signature Sheet 2Signature Sheet 3

Trang 33

Signature Sheet 2Signature Sheet 4

Trang 34

OREGON DEPARTMENT OF TRANSPORTATION

(The POR stamps, signs, and fills in section numbers in the Professional of Record Certification below according to ODOT Technical Services Bulletin TSB 06-02(B) and also signs the acknowledgement of compliance below Delete all extra certification lines and pages.)

PROFESSIONAL OF RECORD CERTIFICATION(s):

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Section (fill in section number(s) here) _

Signature

I also acknowledge compliance with Part 2(b) and Part 2(e) of

the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated

July 11, 2008.

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Section (fill in section number(s) here) _

Signature Sheet 2Signature Sheet 5

Trang 35

I also acknowledge compliance with Part 2(b) and Part 2(e) of

the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated

July 11, 2008.

Signature Sheet 2Signature Sheet 6

Trang 36

OREGON DEPARTMENT OF TRANSPORTATION

(The POR stamps, signs, and fills in section numbers in the Professional of Record Certification below according to ODOT Technical Services Bulletin TSB 06-02(B) and also signs the acknowledgement of compliance below Delete all extra certification lines and pages.)

PROFESSIONAL OF RECORD CERTIFICATION(s):

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Section (fill in section number(s) here) _

Signature

I also acknowledge compliance with Part 2(b) and Part 2(e) of

the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated

July 11, 2008.

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Section (fill in section number(s) here) _

Signature Sheet 2Signature Sheet 7

Trang 37

I also acknowledge compliance with Part 2(b) and Part 2(e) of

the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated

July 11, 2008.

Signature Sheet 2Signature Sheet 8

Trang 38

OREGON DEPARTMENT OF TRANSPORTATION

(The POR stamps, signs, and fills in section numbers in the Professional of Record Certification below according to ODOT Technical Services Bulletin TSB 06-02(B) and also signs the acknowledgement of compliance below Delete all extra certification lines and pages.)

PROFESSIONAL OF RECORD CERTIFICATION(s):

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Section (fill in section number(s) here) _

Signature

I also acknowledge compliance with Part 2(b) and Part 2(e) of

the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated

July 11, 2008.

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Section (fill in section number(s) here) _

Signature Sheet 2Signature Sheet 9

Trang 39

I also acknowledge compliance with Part 2(b) and Part 2(e) of

the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated

July 11, 2008.

Signature Sheet 2Signature Sheet 10

Trang 40

OREGON DEPARTMENT OF TRANSPORTATION

(The POR stamps, signs, and fills in section numbers in the Professional of Record Certification below according to ODOT Technical Services Bulletin TSB 06-02(B) and also signs the acknowledgement of compliance below Delete all extra certification lines and pages.)

PROFESSIONAL OF RECORD CERTIFICATION(s):

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Section (fill in section number(s) here) _

Signature

I also acknowledge compliance with Part 2(b) and Part 2(e) of

the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated

July 11, 2008.

Seal w/signature I certify the Special Provision Sections listed below were

prepared by me or under my supervision:

Section (fill in section number(s) here) _

Signature Sheet 2Signature Sheet 11

Ngày đăng: 20/10/2022, 16:45

🧩 Sản phẩm bạn có thể quan tâm

w