Section 1: On-the-Job Training Policy Statement The Contractor shall take all necessary and reasonable steps to ensure that minorities andwomen have the opportunity to compete for and pa
Trang 1BID BOOKLET FOR HIGHWAY CONSTRUCTION
OREGON DEPARTMENT OF TRANSPORTATION
SALEM, OREGON
GRADING AND PAVING STAYTON - SCIO RD & OAKVILLE RD PAVING (LINN COUNTY)
SECTION VARIOUS HIGHWAYS LINN COUNTY AUGUSTSEPTEMBER 2178, 2009
CLASS OF PROJECT FEDERAL AID NUMBER OR "STATE" X-STP-C043(022) CLASS OF WORK FROM CLASS OF WORK SHEET ASPHALT CONCRETE PAVING AND OILING BID OF
Trang 4TIME AND PLACE OF RECEIVING BIDS
Bids for the work described above will be opened and read at the Oregon Department ofTransportation, 455 Airport Road SE, Building E, Salem, Oregon, at 9:00 a.m on the27th18th day of AugustSeptember, 2009
Prior to 8:00 a.m on the above date, submit Bids to:
ODOT Procurement Office, Procurement Manager
455 Airport Road SE, Building K
Salem, Oregon 97301-5348
Between 8:00 a.m and 9:00 a.m on the above date, submit Bids to Building K at the aboveaddress or to:
Oregon Department of Transportation
455 Airport Road SE, Building E
Salem, Oregon
COMPLETION TIME LIMIT
(Use one of the following four completion time options, as appropriate Fill in the blanks.)
(Option 1 When on-site work is to be controlled, use the following.)
Complete all Work to be done under the Contract before the elapse of _ Calendar Days,
or not later than , whichever occurs first
Recording of the elapse of Calendar Days will begin on the day the Contractor beginsOn-Site Work as defined in 00110.20
(Option 2 When seeding establishment or plant establishment is required, use the following Delete what does not apply Remove parentheses.)
Complete all Work to be done under the Contract, except for (seeding establishment) (and)plant establishment, not later than
(Option 3 When there are two completion times, use the following Delete what does not apply Remove parentheses in the second paragraph as needed.)
Trang 5There are two Contract Times on this Project as follows:
(1) Complete all Work to be done under the Contract, except for ,not later than
(2) Complete all Work to be done under the Contract (, except for (seedingestablishment) (and) plant establishment, ) not later than
(Option 4 When none of the three options above apply, use the following.)
Complete all Work to be done under the Contract not later than November 7,2009 _
The Class of Work for this Project is: Asphalt Concrete Paving andOiling _
The Class of Work for this Project is the combination of 1) &2)
The Class of Work for this Project is either: A) , orB) _
The Class of Work for this Project is either: A) , or B) thecombination of 1) & 2) _
(Use this list to fill in the blanks above Delete this list when finished.)
Earthwork and Drainage
Bridges and Structures
Painting
Rock Production
Aggregate Bases
Asphalt Concrete Paving and Oiling
Portland Cement Concrete Paving
Pavement Markings
Signing
Trang 6Landscaping
Miscellaneous Highway AppurtenancesBuildings
Trang 7APPLICABLE SPECIAL PROVISIONS
The Special Provisions booklet applicable to the above-described work, for which Bids will
be opened at the time and place stated above, is that which contains the exact information
as shown above on this page
Bidders are cautioned against basing their Bids on a booklet bearing any differentdescription, date(s), class of project, or class of work
Trang 8SPECIAL PROVISIONS FOR HIGHWAY CONSTRUCTION
OREGON DEPARTMENT OF TRANSPORTATION
SALEM, OREGON
GRADING AND PAVING STAYTON - SCIO RD & OAKVILLE RD PAVING (LINN
COUNTY)SECTION VARIOUS HIGHWAYS LINN COUNTY AUGUSTSEPTEMBER 2718, 2009
If a prebid meeting is required, place prebid information here Otherwise delete this field.
This Project Includes 2009 American Recovery & Reinvestment Act (ARRA) Stimulus Funding
Trang 11TIME AND PLACE OF RECEIVING BIDS
Bids for the work described above will be opened and read at the Oregon Department ofTransportation, 455 Airport Road SE, Bldg E, Salem, Oregon 97301-5348, at 9:00 a.m onthe 27th18th day of AugustSeptember, 2009
COMPLETION TIME LIMIT
(Use one of the following four completion time options, as appropriate Fill in the blanks.)
(Option 1 When on-site work is to be controlled, use the following.)
Complete all Work to be done under the Contract before the elapse of _ Calendar Days,
or not later than , whichever occurs first
Recording of the elapse of Calendar Days will begin on the day the Contractor beginsOn-Site Work as defined in 00110.20
(Option 2 When seeding establishment or plant establishment is required, use the following Delete what does not apply Remove parentheses.)
Complete all Work to be done under the Contract, except for (seeding establishment) (and)plant establishment, not later than
(Option 3 When there are two completion times, use the following Delete what does not apply Remove parentheses in the second paragraph as needed.)
There are two Contract Times on this Project as follows:
(1) Complete all Work to be done under the Contract, except for ,not later than
(2) Complete all Work to be done under the Contract (, except for (seedingestablishment) (and) plant establishment, ) not later than
(Option 4 When none of the three options above apply, use the following.)
Trang 12Complete all Work to be done under the Contract not later than November 7, 2009.
Complete all Work to be done under the Contract not later than
The Class of Work for this Project is: Asphalt Concrete Paving andOiling _
The Class of Work for this Project is the combination of 1) _ &2)
The Class of Work for this Project is either: A) , orB)
The Class of Work for this Project is either: A) _, or B) thecombination of 1) _ & 2) _
(Use this list to fill in the blanks above Delete this list when finished.)
Earthwork and Drainage
Bridges and Structures
Painting
Rock Production
Aggregate Bases
Asphalt Concrete Paving and Oiling
Portland Cement Concrete Paving
Trang 13Information pertaining to this Project may be obtained from the following:
Dave Davies, Project Manager, David Evans and Associates, Inc., 530 Center St NE, Suite
605, Salem: Phone (503) 480-1320, FAX (503) 361-8655
Michael Starnes, ODOT Local Agency Program Liaison, 455 Airport Rd SE, Bldg B, Salem97301; Phone (503) 986-6920
Trang 15Stayton - Scio Rd & Oakville Rd Paving (Linn County)
Grading and Paving
SP TOC FED (06-11-09)
(Follow all instructions If there are no instructions then include the line on all projects Delete what does not apply Remove all instructions before preparing the final document.)
TABLE OF CONTENTS FOR SPECIAL PROVISIONS
AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) FUNDING PROVISIONS
(Use only when ARRA Stimulus Funding is used on the project.)
REQUIRED CONTRACT PROVISIONS FOR FEDERAL-AID CONTRACTS (FHWA-1273) ON-SITE WORKFORCE AFFIRMATIVE ACTION REQUIREMENTS FOR WOMEN AND MINORITIES ON FEDERAL-AID CONTRACTS
EQUAL EMPLOYMENT OPPORTUNITY PROVISIONS
EQUAL EMPLOYMENT OPPORTUNITY-ASPIRATIONAL TARGET PROVISIONS (Use
only when aspirational diversity target provisions are required Obtain information from the Office of Civil Rights.)
DBE AND MWESB PROVISIONS
ASSIGNED CONTRACT GOAL AND TARGET
ON-THE-JOB TRAINING (Use when there is only on-the-job training Obtain
information from the Office of Civil Rights.)
REIMBURSABLE FEDERAL ON-THE-JOB AND APPRENTICESHIP TRAINING (Use only
when reimbursable OJT and apprenticeship training is required Obtain information from the Office of Civil Rights.)
INDIAN EMPLOYMENT PREFERENCE GOAL AND COMPLIANCE FEE (Use with Indian
Preference in Employment on Federal-Aid Projects.)
RAILROAD CONTRACTOR REQUIREMENTS (Use only with railroad involvement.)
PROJECT WAGE RATES
WEB SITE ADDRESSES
WORK TO BE DONE .1
SECTION 00110 - ORGANIZATION, CONVENTIONS, ABBREVIATIONS AND DEFINITIONS .2
SECTION 00120 - BIDDING REQUIREMENTS AND PROCEDURES .2
SECTION 00130 - AWARD AND EXECUTION OF CONTRACT .2
SECTION 00140 - SCOPE OF WORK .2
SECTION 00150 - CONTROL OF WORK .3
SECTION 00160 - SOURCE OF MATERIALS .4
SECTION 00165 - QUALITY OF MATERIALS .4
SECTION 00170 - LEGAL RELATIONS AND RESPONSIBILITIES .4
SECTION 00180 - PROSECUTION AND PROGRESS .6
SECTION 00190 - MEASUREMENT OF PAY QUANTITIES .8
SECTION 00195 - PAYMENT .8
SECTION 00196 - PAYMENT FOR EXTRA WORK .11
SECTION 00197 - PAYMENT FOR FORCE ACCOUNT WORK .11
SECTION 00199 - DISAGREEMENTS, PROTESTS, AND CLAIMS .11
SECTION 00210 - MOBILIZATION .12
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC .12
SECTION 00225 - WORK ZONE TRAFFIC CONTROL .13
SECTION 00280 - EROSION AND SEDIMENT CONTROL .15
SECTION 00290 - ENVIRONMENTAL PROTECTION .15
SECTION 00350 - GEOSYNTHETIC INSTALLATION .17
i
Trang 16Stayton - Scio Rd & Oakville Rd Paving (Linn County)
Grading and Paving
SECTION 00440 - COMMERCIAL GRADE CONCRETE .19
SECTION 00442 - CONTROLLED LOW STRENGTH MATERIALS .19
SECTION 00490 - WORK ON EXISTING SEWERS AND STRUCTURES .19
SECTION 00503 - BRIDGE DECK COLD PLANE PAVEMENT REMOVAL .20
SECTION 00620 - COLD PLANE PAVEMENT REMOVAL .21
SECTION 00640 - AGGREGATE BASE AND SHOULDERS .21
SECTION 00730 - EMULSIFIED ASPHALT TACK COAT .22
SECTION 00745 - HOT MIXED ASPHALT CONCRETE (HMAC) .22
SECTION 00749 - MISCELLANEOUS ASPHALT CONCRETE STRUCTURES .30
SECTION 00850 - COMMON PROVISIONS FOR PAVEMENT MARKINGS .31
SECTION 00860 - LONGITUDINAL PAVEMENT MARKINGS - PAINT .31
SECTION 00867 - TRANSVERSE PAVEMENT MARKINGS - LEGENDS AND BARS .32
SECTION 02110 - POSTS, BLOCKS, AND BRACES .33
SECTION 02320 - GEOSYNTHETICS .33
COATING SYSTEM WARRANTY AND PERFORMANCE BOND (Use only on maintenance coating projects.) WORK TO BE DONE .1
SECTION 00110 - ORGANIZATION, CONVENTIONS, ABBREVIATIONS AND DEFINITIONS .2
SECTION 00120 - BIDDING REQUIREMENTS AND PROCEDURES .2
SECTION 00130 - AWARD AND EXECUTION OF CONTRACT .3
SECTION 00140 - SCOPE OF WORK .4
SECTION 00150 - CONTROL OF WORK .4
SECTION 00160 - SOURCE OF MATERIALS .7
SECTION 00165 - QUALITY OF MATERIALS .8
SECTION 00170 - LEGAL RELATIONS AND RESPONSIBILITIES .8
SECTION 00180 - PROSECUTION AND PROGRESS .13
SECTION 00190 - MEASUREMENT OF PAY QUANTITIES .19
SECTION 00195 - PAYMENT .20
SECTION 00196 - PAYMENT FOR EXTRA WORK .25
SECTION 00197 - PAYMENT FOR FORCE ACCOUNT WORK .25
SECTION 00199 - DISAGREEMENTS, PROTESTS, AND CLAIMS .25
SECTION 00210 - MOBILIZATION .26
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC .26
SECTION 00225 - WORK ZONE TRAFFIC CONTROL .29
SECTION 00280 - EROSION AND SEDIMENT CONTROL .36
SECTION 00290 - ENVIRONMENTAL PROTECTION .38
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS .55
SECTION 00320 - CLEARING AND GRUBBING .55
SECTION 00440 - COMMERCIAL GRADE CONCRETE .57
SECTION 00503 - BRIDGE DECK COLD PLANE PAVEMENT REMOVAL .58
SECTION 00620 - COLD PLANE PAVEMENT REMOVAL .60
SECTION 00640 - AGGREGATE BASE AND SHOULDERS .60
SECTION 00730 - EMULSIFIED ASPHALT TACK COAT .61
SECTION 00745 - HOT MIXED ASPHALT CONCRETE (HMAC) .61
SECTION 00749 - MISCELLANEOUS ASPHALT CONCRETE STRUCTURES .75
SECTION 00810 - METAL GUARDRAIL .77
ii
Trang 17Stayton - Scio Rd & Oakville Rd Paving (Linn County)
Grading and Paving
SECTION 00850 - COMMON PROVISIONS FOR PAVEMENT MARKINGS .77SECTION 00860 - LONGITUDINAL PAVEMENT MARKINGS - PAINT .79SECTION 00867 - TRANSVERSE PAVEMENT MARKINGS - LEGENDS AND
BARS .79SECTION 01030 - SEEDING .81SECTION 02110 - POSTS, BLOCKS, AND BRACES .85PLANS (Use only when plans are included in the Special Provisions.)
BID SCHEDULE
iii
Trang 19Stayton - Scio Rd & Oakville Rd Paving (Linn County)
Grading and Paving
SP DBE (06-04-09)
ASSIGNED DBE CONTRACT GOAL
FOR AFDBE AND ASDBE
The assigned minimum DBE (AFDBE/ASDBE) goal for this Project is 1_ %.
(This goal is only a part of the overall Statewide DBE program.)
A DBE Directory is available from the Office of Minority, Women and Emerging SmallBusiness (OMWESB) web site at http://www4.cbs.state.or.us/ex/dir/omwesb/ or bytelephone at (503) 947-7924
Trang 20Stayton - Scio Rd & Oakville Rd Paving Grading and Paving
Trang 21Stayton - Scio Rd & Oakville Rd Paving (Linn County)
Paving
Stayton - Scio Rd & Oakville Rd Paving
Grading and Paving
ASSIGNED MWESB ASPIRATIONAL TARGETS
The assigned MWESB aspirational target for this Project is 3 _ %
An MWESB Directory is available from the Office of Minority, Women and Emerging SmallBusiness (OMWESB) web site at http://www4.cbs.state.or.us/ex/dir/omwesb/ or bytelephone at (503) 947-7924
Trang 23Stayton - Scio Rd & Oakville Rd Paving
Grading and Paving
SP OJT FED (03-31-08)
(Use this OJT provision when required by the Office of Civil Rights When this provision is used, be sure to include an OJT bid item.)
FEDERAL ON-THE-JOB TRAINING SPECIAL PROVISIONS
This On-the-Job Training (OJT) special provision supersedes subparagraph 7e of the
"On-Site Workforce Affirmative Action Requirements for Women and Minorities onFederal-Aid Contracts" and is in implementation of 23 U.S.C 140(a) All other provisionsapply
Section 1: On-the-Job Training Policy Statement
The Contractor shall take all necessary and reasonable steps to ensure that minorities andwomen have the opportunity to compete for and participate as trainees or apprentices and
to develop as journey-level workers in the type of trade or job classification employed.Contractors may use either a Bureau of Labor and Industries (BOLI) apprenticeship ortraining program, or develop their own on-the-job training program approved by OregonDepartment of Transportation (ODOT) and Federal Highway Administration (FHWA) tosatisfy this OJT requirement
Section 2: Affirmative Action Requirement
Training and upgrading minorities and women in highway construction trades is the primarygoal of these special provisions This shall be accomplished by making systematic anddirect recruitment efforts through public and private sources that are likely to yield minoritiesand women available for training on the work under this contract
When filling these training positions, Contractors and subcontractors are encouraged to hirewomen and minorities who have previously been approved to participate in the On-the-JobTraining Program and have not yet completed their training, or who are currently registered
in a BOLI-approved apprenticeship or training program
Whenever minorities or women are not placed in training positions specified in thesespecial provisions, the Contractor shall provide documented evidence of its affirmativeaction recruitment efforts ODOT will review the Contractor’s recruitment efforts todetermine whether the Contractor has satisfied the Good Faith criteria specified in the
"On Site Workforce Affirmative Action Requirements for Women and Minorities onFederal-Aid Contracts"
Neither the provisions of any collective bargaining agreement, nor the failure by a unionwith whom the Contractor has a collective bargaining agreement, nor any agreement theContractor has with a joint apprenticeship and training committee, shall excuse theContractor’s obligations under these special provisions
This training commitment is not intended, and shall not be used, to discriminate against anyapplicant for training, whether members of a minority group or not
Trang 24Stayton - Scio Rd & Oakville Rd Paving
Grading and Paving
Whenever trainees or apprentices are terminated, the Contractor shall provide documentedevidence to the Project Manager that shows cause for the termination or voluntaryseparation
Section 3: Assigned On-the-Job Training Positions
(Enter the number of OJT positions in the blank Obtain the number from ODOT Office of Civil Rights.)
The number of on-the-job training positions required under these special provisions is .The ratio of apprentices to journey level workers shall be in accordance with the acceptedstandards for the particular craft or occupation For OJT programs developed by theContractor, the ratio of trainees to journey level workers shall be spelled out in the trainingprogram and are subject to approval by ODOT and FHWA
Whenever a portion of the contract work is subcontracted, the Contractor shall determinehow many, if any, of the trainees or apprentices are to be trained by the subcontractor TheContractor, however, shall retain the responsibility for meeting the training requirements ofthese special provisions and shall also ensure that these provisions apply to eachsubcontract to which training positions are assigned
A Contractor’s request to substitute an on-the-job training position from one craft to anothercraft must be approved by ODOT’s Office of Civil Rights
Section 4: Training Requirements
The intent of these provisions is to provide real and meaningful training in the constructioncrafts rather than clerical or secretarial positions Training in classifications such as flagger,bookkeeper, clerk/typist or secretary is not permissible Training is permissible in lowerlevel management positions such as office engineers, estimators, etc., where the training isoriented toward construction applications and is approved by the Federal HighwayAdministration Off-site training is permissible only when it is an integral part of anapproved training program, meets the criteria under Section 8, paragraph 4 of these specialprovisions, and does not comprise a significant part of the overall training
The Contractor must have and maintain at all times sufficient equipment and fully trainedjourney level workers to train apprentices or trainees in the work processes and comply withthese special provisions A valid certification by an appropriate apprenticeship committeethat the Contractor is an approved training agent shall be prima facie proof of compliancewith this requirement
Section 5: Training/Apprenticeship Programs
Training under these provisions shall be conducted in accordance with a training programsubmitted by the Contractor and approved by ODOT's Office of Civil Rights and the FederalHighway Administration (FHWA) OJT programs for which the Contractor has obtainedapproval of BOLI’s Oregon State Apprenticeship and Training Council shall be acceptedunder these provisions
Training Programs (ODOT Form 731-0335) shall be submitted at the pre-constructionconference ODOT will track training activities provided by the Contractor to trainees
Trang 25Stayton - Scio Rd & Oakville Rd Paving
Grading and Paving
working under an approved training program The Contractor shall provide ODOT withmonthly progress reports for all trainees working under an approved training program.Trainees shall be paid at least 60% of the appropriate minimum journey level rate specified
in the contract for the first half of the training period, 75% for the third quarter of the trainingperiod, and 90% for the last quarter of the training period If apprentices are enrolled inBOLI-registered program, the appropriate rates approved by the Department of Labor or inconnection with the apprenticeship program shall apply to all trainees being trained for thesame classification who are covered by this special provision
Each individual Training Program must be approved by ODOT’s Office of Civil Rights prior
to commencing work in the craft in which the trainee will be trained The Contractor orsubcontractor who is training an individual not enrolled in an apprenticeship program must
be able to certify in some manner that the trainee has completed an on-the-job trainingprogram This certification will be provided to the trainee and a copy to ODOT’s Office ofCivil Rights upon completion of the training program
By the 10th of each month, an Apprentice/Trainee Monthly Progress Record (Form731-0332) for each person participating in the On-the-Job Training Program,completed and signed by the trainee The Monthly Progress Record that aContractor or subcontractor routinely sends to an apprenticeship program may beused in lieu of the ODOT Apprentice/Trainee Monthly Progress Record
By the 10th of each month, an Employment Utilization Report (Form 731-0394).This report reflects work hours by craft, race and gender This report is required ofall Contractors and subcontractors on contracts valued $10,000 and above,regardless of their participation in the OJT Program
Upon completion of the contract, document to trainee and ODOT the amount andtype of training completed
All required forms will be sent to the Contractor and ODOT Project Manager by the Office ofCivil Rights at the time of contract award Additional forms may be obtained from the Office
of Civil Rights by calling (503) 986-4350
Trang 26Stayton - Scio Rd & Oakville Rd Paving
Grading and Paving
Section 7: Monitoring and Compliance
ODOT will monitor the Contractor’s actions for compliance with these special provisions.Actions, which will be monitored, include:
Employment of trainees as required for this contract
Demonstration of Good Faith Efforts when contractually required training provisionsare not filled with affirmative action candidates
Maintenance of the records and submission of the reports required by theseprovisions
If the Contractor does not comply with these special provisions, ODOT may withholdprogress payments until compliance with the above is achieved, or impose other lawfulremedies, including holding the Contractor in breach Two breaches of contract exposesthe Contractor to revocation of ODOT’s prequalification status and/or disqualification fromall State of Oregon public contracting opportunities
If subcontractors participate in the OJT Program, the Contractor will be responsible for thesubcontractor’s compliance with the requirements of these special provisions in accordancewith Section 00180.10 of the Supplemental Specifications
Section 8: Measurement and Payment
The pay quantity for On-the-Job Training will be measured by the actual number of hours oftraining provided, measured to the nearest one-half hour
Except as otherwise noted below, the Contractor will be paid training provided to anemployee approved by ODOT and trained in accordance with an approved trainingprogram The Contractor must obtain approval from ODOT to overrun OJT bid item hoursbeyond the quantity shown in the bid schedule in order to be eligible for reimbursement.Payment may be made for training persons in excess of the number specified in Section 3,provided the following has been approved by ODOT prior to the date that excess trainingcommences
The number, names, gender and race of additional trainees
The craft(s) in which training is to be provided
A training program for each trainee
If not minority or female, documentation of good faith efforts to recruit minorities andwomen in proposed positions
Payment for training under these provisions will be made even though the Contractorreceives additional training program funds from other sources, provided such other sources
do not specifically prohibit the Contractor from receiving other reimbursement.Reimbursement for off-site training will only be made where the Contractor does one ormore of the following and the trainees/apprentices are concurrently employed in a Federal-aid project:
Contributes to the cost of the training
Provides the instruction to the trainee/apprentice
Pays the trainee’s/apprentice’s wage during the off-site training period
Trang 27Stayton - Scio Rd & Oakville Rd Paving
Grading and Paving
Payments made to the Contractor may be recalled if either the failure to provide therequired training, or the failure to hire the trainee/apprentice upon completion of thecontractor’s OJT program is caused by the Contractor’s lack of Good Faith Efforts inmeeting the requirements of the special provisions Such lack of Good Faith Efforts shallconstitute non-compliance and may lead to Breach of Contract
The item "On-the-Job Training" will be paid in full for training provided and properlydocumented, in conformance with these provisions
No payment for training will be made until the Contractor has submitted all requireddocumentation and approved by ODOT
The item "On-the-Job Training" is intended to cover the Contractor’s additional costsassociated with administering the On-the-Job Training provisions of this contract The On-the-Job Training bid item is not intended to reimburse the Contractor for actual costs nor forthe hourly wage or fringe benefits of the trainee
********
June 2006
Trang 29(The preparer of these special provisions signs and dates the acknowledgement
of compliance below The preparer may or may not hold a PE stamp If the preparer does hold a PE stamp and also takes responsibility for all or part of the various Sections, the preparer will also apply the PE stamp and sign under the
"PROFESSIONAL OF RECORD CERTIFICATION(S)" and also sign the acknowledgement of compliance on the following page(es).)
CONSOLIDATED SPECIAL PROVISIONS
As the preparer of the consolidated specifications for this Project I acknowledge compliance
with the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT
Highway Construction Contracts" dated July 11, 2008.
By: _ Date: _
David Stitz
David Evans and Associates, Inc
Signature Sheet 1
Trang 31OREGON DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
PavingStayton - Scio Rd & Oakville Rd Paving (Linn County)
Various HighwaysLinn CountyGrading and PavingStayton - Scio Rd & Oakville Rd Paving Section
Various HighwaysLinn County
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Sections 00220, 00225, 00280, 00290, 00350,
00440, 00442, 00490, 00503, 00620, 00640, 00730,
00745, 00749, 00850, 00860 and 00867 (fill in section number(s) here) _
Signature
I also acknowledge compliance with Part 2(b) and Part 2(e) of
the "Modified Exemption from DOJ Legal Sufficiency Review
and Approval for ODOT Highway Construction Contracts" dated
July 11, 2008.
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Section (fill in section number(s) here) _
Signature Sheet 2Signature Sheet 2
Trang 32
I also acknowledge compliance with Part 2(b) and Part 2(e) of
the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated
July 11, 2008.
Signature Sheet 2Signature Sheet 3
Trang 33Signature Sheet 2Signature Sheet 4
Trang 34OREGON DEPARTMENT OF TRANSPORTATION
(The POR stamps, signs, and fills in section numbers in the Professional of Record Certification below according to ODOT Technical Services Bulletin TSB 06-02(B) and also signs the acknowledgement of compliance below Delete all extra certification lines and pages.)
PROFESSIONAL OF RECORD CERTIFICATION(s):
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Section (fill in section number(s) here) _
Signature
I also acknowledge compliance with Part 2(b) and Part 2(e) of
the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated
July 11, 2008.
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Section (fill in section number(s) here) _
Signature Sheet 2Signature Sheet 5
Trang 35
I also acknowledge compliance with Part 2(b) and Part 2(e) of
the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated
July 11, 2008.
Signature Sheet 2Signature Sheet 6
Trang 36OREGON DEPARTMENT OF TRANSPORTATION
(The POR stamps, signs, and fills in section numbers in the Professional of Record Certification below according to ODOT Technical Services Bulletin TSB 06-02(B) and also signs the acknowledgement of compliance below Delete all extra certification lines and pages.)
PROFESSIONAL OF RECORD CERTIFICATION(s):
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Section (fill in section number(s) here) _
Signature
I also acknowledge compliance with Part 2(b) and Part 2(e) of
the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated
July 11, 2008.
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Section (fill in section number(s) here) _
Signature Sheet 2Signature Sheet 7
Trang 37
I also acknowledge compliance with Part 2(b) and Part 2(e) of
the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated
July 11, 2008.
Signature Sheet 2Signature Sheet 8
Trang 38OREGON DEPARTMENT OF TRANSPORTATION
(The POR stamps, signs, and fills in section numbers in the Professional of Record Certification below according to ODOT Technical Services Bulletin TSB 06-02(B) and also signs the acknowledgement of compliance below Delete all extra certification lines and pages.)
PROFESSIONAL OF RECORD CERTIFICATION(s):
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Section (fill in section number(s) here) _
Signature
I also acknowledge compliance with Part 2(b) and Part 2(e) of
the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated
July 11, 2008.
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Section (fill in section number(s) here) _
Signature Sheet 2Signature Sheet 9
Trang 39
I also acknowledge compliance with Part 2(b) and Part 2(e) of
the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated
July 11, 2008.
Signature Sheet 2Signature Sheet 10
Trang 40OREGON DEPARTMENT OF TRANSPORTATION
(The POR stamps, signs, and fills in section numbers in the Professional of Record Certification below according to ODOT Technical Services Bulletin TSB 06-02(B) and also signs the acknowledgement of compliance below Delete all extra certification lines and pages.)
PROFESSIONAL OF RECORD CERTIFICATION(s):
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Section (fill in section number(s) here) _
Signature
I also acknowledge compliance with Part 2(b) and Part 2(e) of
the "Modified Exemption from DOJ Legal Sufficiency Review and Approval for ODOT Highway Construction Contracts" dated
July 11, 2008.
Seal w/signature I certify the Special Provision Sections listed below were
prepared by me or under my supervision:
Section (fill in section number(s) here) _
Signature Sheet 2Signature Sheet 11