QUALITY ASSURANCE ASPECT IN THE PRODUCTION OF PZC BASED 99MTC
GENERATOR
Le Van So
Nuclear Research Institute, Dalat , Vietnam
BASIC ELEMENTS OF QUALITY MANAGEMENT
• Appropriate infrastructure
i.e., Quality Policy and “Quality System”
– organizational structure
– procedures
– processes
– resources
• Systematic action QA
• Commitment and Involvement of top executives
Trang 3QA : is defined as the
sum total of the
arrangements made with
the object of ensuring that
products will be of the
quality required for their
intended use
GMP : is that part of QA
aimed at ensuring that
products are consistently
manufactured to a quality
VALIDATION:
• Prospective Validation :
Which is conducted prior to the commercial distribution of
a new RP or a RP made by a new or revised process
• Concurrent Validation:
Which is conducted for a process in which the RP is being manufactured on a production scale before completion of process
- Prospective
- Concurrent
- Retrospective
Other Quality Aspect
GMP Manufacturing
QC
Trang 4appropriate to their
intended use
QC : is that part of GMP
which is concerned with
the sampling,
specification and testing ,
and with the organization,
documentation and
release procedures which
ensure that the necessary
and relevant test are, in
fact, carried out and that
materials are not released
for their intended use, nor
products released for sale
or supply, until their
quality has been judged to
be satisfactory
validation studies
• Retrospective Validation :
Which is conducted for a RP already manufactured on a production scale basesd on accumulated production testing and control data
OTHER QUALITY ASPECT:
( Functions&Responsibilities , Non conformances /corrective preventive action analysis …)
ELEMENTS OF GMP
1 Premises and Environment
2 Equipment
3 Personnel
4 Documentation
5 Manufacturing procedures
– Raw materials
– Processing procedures
– In-process testing
– Processing control
Trang 5– Labelling / packaging / Storage / Shipping
6 Quality control
7 Contract manufacture
8 Import
9 Consignment control
10 Product complaints / Recall
11 Internal audit system
12 Product evaluation and launch protocol
Product evaluation
- Clinical trial
Product launch protocol
Ten Commandments of GMP
– We should write procedures
– We should follow our written procedure
– We should document (record) our work
– We should validate our work
– We should design and build proper facilities and equipment
– We should maintain our facilities and equipment
– We should be competent (as a result of education, training and experience)
– We should be clean
– We should build in quality not test quality in your product
– We should audit for compliance
EVALUATION STUDIES ON THE PROCEDURE OF PZC
Trang 61 Outline of the technology for PZC based 99m Tc generator
production
Table 1: Outline of the technologies for 99mTc generator production
Raw materials
(Commercia
l products) and preparation
Hot cell process 1 Hot cell process 2
(Finished generator
assembling –Hot
assembling)
Inactive clean-room process
(Generator components assembling,
Cold Assembling)
Fission
based
generator
-Fission
99
Mo solution -Al 2 O 3
adsorbent
– Dispensing 99Mo stock solution
– Dispensing 99Mo stock solution – 99Mo adsorption
on Alumina column Gel based
Generator
- (n,γ) 99
Mo solution
- Chemicals ZrOCl2,…
– Chemical synthesis and preparation of gel powder – Dispensing gel and column loading
PZC-based
Generator
- (n,γ) 99
Mo solution
- PZC
adsorbent
– Dispensing 99Mo solution and
99
Mo adsorption – Column loading
2 QA & GMP Requirements for a new (PZC based)procedure for 99m Tc generator production
• Raw materials
o Finished 99mTc generator product design and generator component preparation
o PZC adsorbent ( Specification )
Trang 77
• Equipment and facilities
o Mo-99 adsorption and PZC column loading machine
o Hot cell facility arrangement – Manipulator and conveyor
• Procedure (standard procedure)
o Description of process
– 99Mo Adsorption
– Loading 99Mo –PZC column
– Generator component cold and hot assembling
o Raw material control
– 99Mo Solution (radioactivity and Molybdenum content)
– PZC and Al2O3 adsorbent (99Mo Adsorption capacity, 99mTc elution yield, Mo and Zr breakthrough , particle size, stability)
– Generator components (column ,solution- line…)
– Elution kit (saline and evaluated vials)
o In-process control
– Radioactivity of solution (pre-and post- adsorption)
– pH of solution (pre- and post- adsorption)
– Temperature and time of adsorption
– Radiation protection monitoring
• Quality Control
o Product specification of Pertechnetate solution eluted from PZC based Tc-99m generator
o Testing procedure (pH, Radiochemical purity, Radionuclide identification,
o Radionuclidic purity, Chemical purity
(Aluminium, Zirconium content , Sterility, Bacterial Endotoxin )
• Product evaluation and launch protocol
o Pre-Clinical studies
– Biological test (bio-distribution studies in test animal)
– Toxicity test
– Pharmacokinetics studies
– Radiation safety
– Environment assessment including waste disposal studies
o Clinical trials
o Product launch protocol
– Registration
– Market approval