The contractor shall be responsible for making good in expeditions & work man like manner any defects which may be found with in One Year of the handing over of the premises or premise
Trang 1BANK OF INDIA, ZONAL OFFICE, LUDHIANA ZONE
1st Floor, Surya Kiran Complex Phase-II, The Mall,
Near Rakh Bagh Ludhiana – 141 001
Ph : 0161-2410775 Fax: 0161-2408161 Date: 28.12.2012
TENDER
ELECTRICAL & DATA CABLING
OF
ELECTRICAL /DATA CABLING WORKS IN THE BRANCH OF BANK OF INDIA, BHULLAR ,
LUDHIANA
To
BANK OF INDIA, BRANCH BHULLAR, LUDHIANA
Trang 2Dear Sir,
on behalf of Zonal Manager, Bank of India, Zonal office Ludhiana upto 14.01.2013 on or before 3.00 P.M The schedule, specification & terms and conditions for the above said work is enclosed
2 The sealed cover containing the schedules and the tender in original along with
earnest money for Rs 10,000/= in shape of demand draft in favour of Bank of India, shall be submitted in the office of Zonal Manager, Zonal office, Ludhiana The cover shall superscribe as follows:
TENDER FOR ELECTRICAL WORKS IN B.O.I BRANCH BHULLAR , LUDHIANA.
3 The validity of the offer is to be kept valid up to four months from the date of
opening of the tenders
4 The time completion of work shall be essence of the contract, and shall be
completed within 60 days only from the date of award of work
5 Offers not contained on the tender documents of Bank & not accompanied with
the requisite sum of earnest money & in the form mentioned in the tender, notice, will not be accepted
6 Telegraphic / conditional tender will not be entertained
7 The rates quoted by the tender should be inclusive of sale tax & all other levies, if
any
8 All the valid tenders duly received by the stipulated time will be opened on the
same date i.e on 14.01.2013 in the Zonal office of the Bank at 4.00 P.M, Tenderers are at liberty to be present
9 The contract is entitled to ask for one running payment upto 50% of the total
work done during the currency of work, but an advance intimation of 10 days shall have to be given to Bank, so as to facilitate in preparation / security & release of payments The balance payment will be released after successful & satisfactory completion of work
194 of the Income Tax Act 1961 will be made from the payments to be made to the contractor
11 Any Deviation with respect to Time or specification, Bank without prejudice has
right to-
Trang 312 Contractor in their own interest, are advised to visit the site and get themselves
familiarize in the prevailing situation before submitting their rates No claim what
so ever for ignorance, misunderstanding shall be entertained later
plan his work so as to General working of the branch is not affected He may have
to work only after business hours & during the nights
14 The ZM, Zonal Office, B.O.I Ludhiana reserves the rights to increase or decrease
the under job covered by the present state of the contract
15 The contractor shall be responsible for making good in expeditions & work man
like manner any defects which may be found with in One Year of the handing over
of the premises or premises put to beneficial use In case contractor fails to do so, the same would be get done at his cost & risk The cost incurred by the Bank shall
be deducted from the retention money or any other dues
16 Security deposit equivalent to 10% from each running bill shall be deducted &
shall be returned only after expiry of defects liability period & Retanir money 10% after 12 months
17 The schedule of quantities is only approximate & all the work executed shall be
paid for in accordance with the actual measurements
18 The samples of all the material & work times shall be got approved from the
Architects M/S HERZI SINGH & ASSOCIATES, Plot No.2772, Near Grewal Hospital, Gurdev Nagar, and
Bank of India, Zonal office, Rakh Bagh, Ludhiana
shall be responsibility of the contractor & it shall be made good by him, at his cost
to the entire satisfaction of Architect/ Bank
20 The drawings contain sketches showing salient features details at the various
scale indicating extent of work & specifications to be followed These can be modified by the Bank / Architect from time to time in accordance with technical requirements at the site
21 The work shall be of the highest standard both as regard to material &
workmanship Modern tools & first-class latest techniques shall be employed for its execution
Trang 422 The contractor shall examine all drawings before quoting & commencing of actual
work & report to the Architect / Bank any discrepancy or omission & shortcomings in the drawings
23 The Architect shall have full powers to get the material or workmanship etc.,
inspected & tested by an independent agency for its soundness & adequacy at the cost of contractor
24 The contractor shall employ adequate Labour to complete the work within the
selected time No claim for the Labour shall be entertained The contractor shall also make his own proper arrangement for welfare, housing & safety of his own material & Labour
25 The contractor shall examine all drawings before connecting the actual work &
report to the Architect/ Bank any discrepancies or omission & shortcomings in the drawings or when they conflict with other works, or with each other
progress network of the complete work based on bar chart with in four days as much or modified with the consent of the contractor, shall form part of the agreement
27 The contractor shall visit the site of the work & shall satisfy himself as to the
conditions under which the work is to be performed He shall also check & ascertain the location of any existing structure or equivalent or another which may affect the work No claim, made in ignorance or misunderstanding of site
conditions or a ground of insufficient description shall be entertained
28 The contractor shall get the approval of the Architect regarding the route of
conduits, No of runs, diameter of conduits, No & size of wires, location of pull boxes, route of cables No & size of wires, location of pull boxes, route of cables in ground/ wall for electrical / telephone works covered herein
29 The contractor / his supervisor will be bound to sign the site order book & to carry
out the instructions given therein
31 All materials to be arranged by the contractor for use in the work shall be of
approved make & shall be as per relevant Indian Standard Specification Where it
is mandatory to use I S Marked materials, the contractor shall arrange the same accordingly
32 The contractor shall make his own arrangement at his own cost for all general &
special electrical tools & plants required for electrical work Entire safety precautions during installation shall be taken as per relevant I S., I.E Tulles & CPWD specifications
33 Adopter boxes, wherever used, shall be not less than 16 SWG M S Sheet
Trang 534 All repairs & patchwork, if any, shall be neatly carried out to match the original
finish & to the entire satisfaction of the Architect Any damages to the building due to execution of work shall have to be made good immediately by the contractor at his own cost
35 The telephone conduits & fire alarm conduits shall be laid with G.I fish wires kept
pulled in for pulling of at least 1000mm extra at ends
that the top of box does not exceed 1.65 meters from the floor level & in a suitable location for working by the staff
37 Sockets, base, boxes, conduits, cable glands, ducts & all other materials not
included elsewhere but required for the work shall be provided by the contractor
38 The contractor shall obtain & pay for all permits, licenses & certificates for
approval required by all relevant authorities & organizations All work of the contractor shall confirm to the requirements of local codes
39 The work shall be carried out as per regulations & in best workmanship like
manner by licensed persons The means of licensed persons working in the installation shall be furnished to the Architect prior to the commencement of the work
40 It will be the contractor’s responsibility to get the electrical installation works
inspected by the local statutory Authorities Fire officer and such other officials Extra payments / claims are allowable
41 Sub - Distribution boards shall be equipped with miniature circuit breaker Miniature circuit breakers shall have adequately sized terminals for the out going leads rated chase & neutral bus bars of high conductivity electrolytic Aluminum with Adequately sized terminals or clamps for the incoming conductor
42 It is brought to the attention of the conductor that: -
a) All electrical portable tools should be either 240 volts double insulated or
50 volts via Transformer
b) The contractor has to supply all necessary ladders / steps which must be in good safe condition
c) Entire safety precautions during installations shall be taken as per relevant I.S I.E Rules & C.P.W.D specifications
43 All electrical works shall be carried out along with the progress of Interior works
Any debris due to electrical works shall be removed & the Contractor shall clear the site as soon as the work is completed on his cost
Trang 644 Non flammable insulating barriers shall be provided between poles & phases & all
live protected with non-flammable insulating shields to prevent accidental contact while replacing or operating the miniature circuit breakers
decision shall be binding on the contractor, The condition is also applicable for my material not mentioned in the specifications or schedule of work No deviations are allowed in these even during /after Tender
46 The Drawing will collect Form:
ARCHITECTS:- M/S HERZI SINGH & ASSOCIATES Plot No 2772, Gurdev Nagar, Near Grewal Hospital,
Ludhiana
Ph 0161-2422625 Mob: 098146-15066 E-mail: hssingh12345@Yahoo.in (Blue Print set available 500/- per set)
And
Bank of India Zonal Manager Regional Office, Ludhiana
47 Any clarification regarding drawing Please Contact:
ARCHITECTS : M/S HERZI SINGH & ASSOCIATES Plot No 2772, Gurdev Nagar, Near Grewal Hospital,
Ludhiana
Ph 0161-2422625 Mob: 098146-15066 E-mail:- hssingh12345@Yahoo.in
Signature of Contractor Signature of Architect Signature of A.G.M
Trang 7
LIST OF APPROVED MATIRIALS & MANUFACTURERS
1) Board /Ply : Duro / Green (MR Grade)
2) Laminate : Decolam /Green/Sunduce/Century
3) Door closer / floor spring : Everite, Godrej
4) Drawer & Keyboard : Ebco, & Good Quality
slide rails
5) Glue for fixing commercial
board / laminate Fevicol (Pidilite)
7) Mortice latch & lock : Godrej
8) Vertical blinds : Vista levelor, Mac, Dack
(Vertical/ Horizontal)
9) Pre-laminated board : Nova pan, Deco board, Green
11) Vinyl flooring 2mm th : Bhor (Marblex) spartek, premier
13) M.C.B’s & DB’S : Siemens, Havell’s / L&T, Anchor
14) Wood preservative : Bison by British Paints/ Term seal by PCI
15) Plug & Socket (Metal) : MDS, Crompton, Anchor, Roma, Havell’s
16) Switch & Socket : Anchor, Rome, Havell’s
17) Pipe (PVC) Conduit : Diplast, Avon, (ISI Mark)
18) Telephone cable : Havell’s
22) Textured paint : Spectrum, Heritage
24) Mirror optics Fixtures : Philips, Crompton, Havell’s
25) Spot light & light fittings : Philips, Havell’s, Crompton
26) Aluminum Cladding : Eurobond / Alston
28) MCB and MCB Boxes : Siemens / Havell’s / Anchor / L&T
30) Key Boards Drawer : EBCO 450 MM Length With Mouse Paid
31) Telescopic CPU Stand : Godrej / Marblex
32) Vitrified Tiles : Nitco, Kajaria, Euro, Asian (filling should be
with Grought)
33) Cement : Ambuja, ACC, L&T
35) For wooden molding : 1 st Quality either Ghana Teak wood or C.P
wood as specification in detail specification
of each item
1 Commercial Block Board ( 19 mm thick) : IS –1659 : 1990
Trang 82 Teak Ply 4/6 mm Thick : IS –1328 : 1982
Note:
-Other Materials if required to be used, shall be got approved before execution.
Trang 9
PRICE BID
ELECTRICAL / DATA CABLING WORKS IN THE
BRANCH OF BANK OF INDIA, BHULLAR,
LUDHIANA
SUMMARY OF COST
A ELECTERCAL WORK Rs _
TOTAL Rs _
(Rs. _)
SIGNATURE OF THE CONTRACTOR WITH SEAL
Trang 10BRAND IMAGE
Refurnishing Standardisation-2007
Guidelines for uniform furnishing Pattern
In Branch / Office Premises
The consultants appointed for any refurbishing project as per prevailing laid down guidelines will prepare the layout plan of the branch premises in consultation with corporate services/ A&S Dep’t besides the Information Technology Department and Security Department of Zonal Office and Branch Manager as per the requirement of the Branch
In the branches having more than 500 Diamond Customers, a Diamond Customer Lounge (DC Lounge) along with Relationship Manager (RM) is required to be provided It is preferable to have the DC Lounge along with RM’S Cabin adjacent Branch Manager’s Cabin The modules having indicative sizes of the Diamond Customer Lounge along with Relationship Manager’s Cabin and Branch Manager’s Cabin and Diamond Customer Lounge along with RM’s Cabin are shown in the drawings for your guidance
The entry to the RM’s cabin shall be through DC Lounge and if Manager’s cabin is adjoining to the DC Lounge, one entry to DC Lounge from the Manager’s cabin shall also be provided
Maximum area to be earmarked for the Branch Manager/ Relationship Manager and Diamond Customer’s Lounge shall be 150 sq.ft,75sq.ft respectively
b) Suitable space shall be earmarked for customers for seating (Max.area – 200sq.ft and Max number of seating – 20 No ) if it is not possible to have seating arrangement at one location, if may be suitably scattered
c) Provision for drinking water (Water dispenser) may be provided in the customer area
d) Demarcation on the floor (Preferably in yellow colour ) say 3’ from the cash counters shall be drawn for restricting customers from crowding in front of the cash counters Also stainless steel chain link in between two cash counters may be provided in the customers area
e) All statutory Notices / instructions are to be displayed on a single board which shall
be placed at a prominent location in the customer area The background of Board shall be blue (matching with blue colour laminate No.1 )with white letters