LI X.F CHEN Y.J LUO Y.J LUODOCUMENT SUBMISSION STATUS: FF NOTE: FICHTNER For Final DESCRIPTION PVPOWER PCC For Final EPC CONSTRACTOR’S CONSULTANT VIETNAM OIL AND GAS GROUP PVN EPC CONT
Trang 11 20 May,2016 S LI X.F CHEN Y.J LUO Y.J LUO
DOCUMENT SUBMISSION STATUS: FF
NOTE:
FICHTNER
For Final DESCRIPTION
PVPOWER PCC For Final
EPC CONSTRACTOR’S CONSULTANT
VIETNAM OIL AND GAS GROUP (PVN)
EPC CONTRACTOR
CHKD X.F CHEN 20 May,2016
BIP SUPPLIER:
BABCOCK & WILCOX BEIJING COMPANY LTD.
BURNER MANAGEMENT SYSTEM LOGIC DIAGRAM BOILER FUEL OIL LEAK TEST 12HJF00EB100
PROJECT TITLE
DAELIM INDUSTRIAL CO., LTD.
PETROVIETNAM CONSTRUCTION JOINT
THAI BINH 2 THERMAL POWER PLANT 2 x 600MW
POWER ISLAND PACKAGE SUPPLIER
SOJITZ CORPORATION
DOCUMENT NO: TB2-SDC.VP101-01100-I-M1A-DLG-5041
DRAWING / DOCUMENT TITLE
Cover page 1 / 2
Trang 2Boiler and Boiler BOP
110180
Daelim's Approval Status
Daelim Industrial Co., Ltd.
APPROVED APPROVED WITH COMMENTS RETURNED FOR CORRECTION
BURNER MANAGEMENT SYSTEM LOGIC DIAGRAMBOILER FUEL OIL LEAK TEST 12HJF00EB100
N
-BIP SUPPLIER:
NOT APPLICABLE(REFERENCE ONLY)
DIC'S PERMISSION TO PROCEED OR REVIEW TAKEN ON VENDOR PRINTS SHALL NOT RELIEVE VENDOR FROM ITS RESPONSIBILITIES
OR LIABILITIES UNDER THE PURCHASE ORDER.
DATE : SIGNED BY :
BABCOCK & WILCOX BEIJING COMPANY LTD.
Cover page 2 / 2