Lab 3 1 9e UTP Cable Purchase

Lab 3.1.9c Rollover Cable Construction

Lab 3.1.9c Rollover Cable Construction

... 1 - 3 CCNA 1: Networking Basics v 3. 0 - Lab 3. 1. 9c Copyright  20 03, Cisco Systems, Inc. Lab 3. 1. 9c Rollover Cable Construction Objective • Build ... available. Work individually or in teams. The following resources will be required: 2 - 3 CCNA 1: Networking Basics v 3. 0 - Lab 3. 1. 9c Copyright  20 03, Cisco Systems, Inc. • One 3. 05 to 6 .1 ......

Ngày tải lên: 16/10/2013, 20:15

3 369 0
Lab 3.1.9d Crossover Cable Construction

Lab 3.1.9d Crossover Cable Construction

... 1 - 4 CCNA 1: Networking Basics v 3. 0 - Lab 3. 1. 9d Copyright  20 03, Cisco Systems, Inc. Lab 3. 1. 9d Crossover Cable Construction Objective • Build ... at least 30 .48 cm (12 in.) to it. Standard lengths for this cable are 1. 83 m (6 ft) and 3. 05 m (10 ft). Step 3 Cut a piece of stranded UTP cable to the desired length. Use stranded cable for ......

Ngày tải lên: 19/10/2013, 02:15

4 303 0
Tài liệu Lab 3.1.9a Fluke 620 Basic Cable Testing doc

Tài liệu Lab 3.1.9a Fluke 620 Basic Cable Testing doc

... 1 - 2 CCNA 1: Networking Basics v 3. 0 - Lab 3. 1. 9a Copyright  20 03, Cisco Systems, Inc. Lab 3. 1. 9a Fluke 620 Basic Cable Testing Objective • Use a simple cable tester ... touching, using a basic cable tester. In future labs similar cables will be created. Simple Cable Testers: There are a number of basic cable testers available for less than U.S. $10 0....

Ngày tải lên: 11/12/2013, 13:15

2 406 0
Từ khóa:
w